Landfill Gas and Ground Water Monitoring Sample Clauses

Landfill Gas and Ground Water Monitoring. 14.5.3.1 Gas monitoring xxxxx have been installed around the site to monitor the potential landfill gas migration (Figure 14.2). Recent monitoring data from January 2008 to December 2008 was obtained from EPD as recorded in Appendix L1, and a summary of the monitoring data is presented as follows:
AutoNDA by SimpleDocs

Related to Landfill Gas and Ground Water Monitoring

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

Time is Money Join Law Insider Premium to draft better contracts faster.