Landings. a. In areas of tall timber, greater than 20 metres: i). landings may be constructed during road construction of Class 2 or 3 roads. ii). Landings will be no greater than 0.2 hectares outside of the original right of way width, and shall be spaced at minimum 400 metres apart b. Class 3 winter roads, with a 20 meter right of way will: i). have landings 0.3 hectares in size, and are located outside of original right of way width and will be spaced at a minimum 400 meters apart. c. No portion of the landing constructed outside of the approved right of way may be stumped unless approved by the Area Forester. d. No landing will be constructed within 100 metres of a waterbody crossing unless authorized by the Area Forester.
Appears in 2 contracts
Samples: Forest Management Agreement, Forest Management Agreement
Landings. a. In areas of tall timber, greater than 20 metres:
i). landings ) Landings may be constructed during road construction of Class 2 or 3 roads.
ii). ) Landings will be no greater than 0.2 hectares outside of the original right of way width, and shall be spaced at minimum 400 metres apart.
b. Class 3 winter roads, with a 20 meter right of way will:
i). have ) Have landings 0.3 hectares in size, and are located outside of original right of way width and will be spaced at a minimum 400 meters apart.
c. No portion of the landing constructed outside of the approved right of way may be stumped unless approved by the Area Forester.
d. No landing will be constructed within 100 metres of a waterbody crossing unless authorized by the Area Forester.
Appears in 2 contracts
Samples: Forest Management Agreement, Forest Management Agreement
Landings. a. In areas of tall timber, greater than 20 metres:
i). landings i. Landings may be constructed during road construction of Class 2 or 3 roads.
ii). Landings will be no greater than 0.2 hectares outside of the original right of way width, and shall be spaced at minimum 400 metres apart.
b. Class 3 winter roads, with a 20 meter right of way will:
i). will have landings 0.3 hectares in size, and are located outside of original right of way width and will be spaced at a minimum 400 meters apart.
c. No portion of the landing constructed outside of the approved right of way may be stumped unless approved by the Area Forester.
d. No landing will be constructed within 100 metres of a waterbody crossing unless authorized by the Area Forester.
Appears in 1 contract
Samples: Forest Management Agreement