Linking Primary and Secondary Prevention Sample Clauses

Linking Primary and Secondary Prevention. 8. Utilization of Disability Prevention Principals.
AutoNDA by SimpleDocs

Related to Linking Primary and Secondary Prevention

  • Background Screening and Security 13 These General Contract Conditions supersede and replace in their entirety all General Contract Conditions, Form PUR 1000, which is incorporated by reference in Rule 60A-1.002, Florida Administrative Code (F.A.C.)

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • DATA HANDLING AND SECURITY It will always be the responsibility of the selected Contractor to manage data transfer and to secure all data appropriately during the project to prevent unauthorized access to all data, products, and deliverables.

  • ROLE OF THE PRIMARY AND SECONDARY CONTACTS 5.01 Primary and Secondary Contact(s). The Resident, in executing this Agreement, is required to identify a “Primary Contact” and a “Secondary Contact”. It is strongly recommended that these contacts are parents or legal guardians of the Resident. The Primary Contact serves as the individual that is contacted by the Manager if concerns or problems arise with the Resident, as detailed in section 5.02 below. If the Primary Contact is not available, the Secondary Contact will be contacted.

  • Safety and Security Contractor is responsible for maintaining safety in the performance of this Contract. Contractor shall be responsible for complying with the District’s rules and regulations pertaining to safety, security, and driving on school grounds, particularly when children are present.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Time is Money Join Law Insider Premium to draft better contracts faster.