LOT I: MISSION SYSTEMS AVIONICS Sample Clauses

LOT I: MISSION SYSTEMS AVIONICS. REQUIREMENTS (UNRESTRICTED)
AutoNDA by SimpleDocs

Related to LOT I: MISSION SYSTEMS AVIONICS

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Network Resource Interconnection Service (check if selected)

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Information Systems The Official Agency in conjunction with the Authority will meet the relevant requirements of Articles 131 to 136 of Regulation (EU) 2017/625 and Implementing Regulation (EU) 2019/1715 as appropriate to the Official Agency. The Official Agency shall record appropriate data in the Official Agency Premises Inspection database (OAPI), which will be further developed over the life of the contract. Data should be entered into the database on an ongoing basis but shall be entered within one month of the activity taking place, unless otherwise agreed with the Authority.

  • CONSTRUCTION MANAGER’S SERVICES The services which the Construction Manager shall provide include, but are not limited to, those described or specified herein. The services described or specified shall not be deemed to constitute a comprehensive specification having the effect of excluding services not specifically mentioned.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

Time is Money Join Law Insider Premium to draft better contracts faster.