Manuals and Drawings. 4.4.1 Along with the tender, the tenderer shall furnish along with the tender detailed literature, product leaflets, and performance data related to all the pieces of equipment offered. 4.4.2 The successful tenderer is also required to submit the following drawings in triplicate for approval before manufacture of the equipment and commencement of the work. a) Bar chart indicating the completion of various activities with dates. b) General arrangement drawing of the equipment including layout drawing complete With dimensions. c) Weights of the assembled equipment including dynamic loads imposed by the Equipment. d) Details of foundations that will be required for the equipment. e) Electrical control schematic diagram. 4.4.3 Before the Goods and Services are taken over by the Employer, the Contractor shall supply of manuals together with AS BUILT DRAWINGS of the goods and equipment. These shall be in such detail as will enable the Employer to operate, maintain, adjust and repair all parts of the equipment as stated in the specifications. 4.4.4 It shall be the obligation of the Contractor to train and familiarize the designated person by the Employer in regard to the operation manual and drawings
Appears in 7 contracts
Samples: Proposed Rate Contract for Routine Maintenance Works, Proposed Rate Contract for Routine Maintenance Works, Rate Contract