Common use of Markers Clause in Contracts

Markers. All Facilities Remove existing pavement markers in preparation for paving. Repair any pavement damage due to existing pavement marker removal prior to the end of the work day. Dispose of existing pavement markers as directed by the Engineer. No direct payment will be made for this work as it will be incidental to the paving operation. Install permanent pavement markers within 60 calendar days after completing the resurfacing on each map. Pavement markers shall be installed in accordance with Standard Drawing 1205.12 and Standard Drawings 1250.01 through 1253.01 of the 2012 Roadway Standard Drawings and Sections 1250 through 1253 of the 2012 Standard Specifications.

Appears in 7 contracts

Samples: Power Equipment Operators, Proposal Item Sheet, connect.ncdot.gov

AutoNDA by SimpleDocs

Markers. All Facilities Remove existing pavement markers in preparation for paving. Repair any pavement damage due to existing pavement marker removal prior to the end of the work day. Dispose of existing pavement markers as directed by the Engineer. No direct payment will be made for this work as it will be incidental to the paving operation. Install permanent pavement markers within 60 calendar days after completing the resurfacing on each map. Pavement markers shall be installed in accordance with Standard Drawing 1205.12 and Standard Drawings 1250.01 through 1253.01 of the 2012 2018 Roadway Standard Drawings and Sections 1250 through 1253 of the 2012 2018 Standard Specifications.

Appears in 7 contracts

Samples: Proposal Item Sheet, Proposal Item Sheet, connect.ncdot.gov

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.