MATERIAL AND WORKMANSHIP. 5.12.1 The ESCO shall ensure that all materials used by the ESCO and its subcontractors and workmanship performed or caused to be performed by the ESCO in connection with the work meets or exceeds all applicable codes. Where conflicts exist between applicable codes, the more stringent provision shall apply. 5.12.2 The ESCO shall ensure that all equipment and materials to be used in the work for which Underwriters Laboratory labeling services is provided shall be UL labeled. 5.12.3 The ESCO shall ensure the work conforms to all applicable codes including but not limited to: 5.12.3.1 Applicable construction and electrical code; 5.12.3.2 Underwriters Laboratories (UL); 5.12.3.3 Insulated Power Cable Engineers Association (IPCEA); 5.12.3.4 National Fire Protection Association (NFPA); 5.12.3.5 American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE); 5.12.3.6 National Electrical Manufacturers Association (NEMA); 5.12.3.7 American National Standards Institute (ANSI); 5.12.3.8 Institute of Electrical and Electronic Engineers (IEEE); and 5.12.3.9 The Building Industry Consulting Services International (BICSI). 5.12.4 The ESCO shall advise the University in writing in a timely manner of all existing equipment and materials to be replaced at the Facility as part of the work and the University shall within thirty (30) days designate in writing to the ESCO the equipment and materials which should not be disposed of off-site by the ESCO. The ESCO shall be responsible for the disposal of all equipment and materials removed or replaced through its performance of the work in accordance with all applicable laws and regulations regarding such disposal, except those items designated by the University as nondisposable. The cost of disposal to be performed by the ESCO is included in the ESCO compensation for the work set forth in Schedule C.
Appears in 3 contracts
Samples: Energy Services Agreement, Energy Services Agreement, Energy Services Agreement
MATERIAL AND WORKMANSHIP. 5.12.1 (a) The ESCO COMPANY shall ensure that all materials used by the ESCO COMPANY and its subcontractors and workmanship performed or caused to be performed by the ESCO COMPANY in connection with the work Work meets or exceeds all applicable codescodes and is performed in a workmanlike manner. Where conflicts exist between applicable codes, the more stringent provision shall apply.;
5.12.2 (b) The ESCO COMPANY shall ensure that all equipment and materials to be used in the work Work for which Underwriters Laboratory labeling services is provided shall be UL labeled.;
5.12.3 (c) The ESCO COMPANY shall ensure obey the work conforms to all applicable following list of codes including but not limited towhere applicable:
5.12.3.1 (1) Applicable construction and electrical code;
5.12.3.2 (2) Underwriters Laboratories (UL);
5.12.3.3 (3) Insulated Power Cable Engineers Association (IPCEA);
5.12.3.4 (4) National Fire Protection Association Electrical Code (NFPANEC);
5.12.3.5 American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE);
5.12.3.6 5) National Electrical Manufacturers Association (NEMA);
5.12.3.7 (6) American National Standards Institute (ANSI);; and
5.12.3.8 (7) Institute of Electrical and Electronic Engineers (IEEE); and
5.12.3.9 The Building Industry Consulting Services International (BICSI).
5.12.4 (d) The ESCO COMPANY shall timely advise the University CUSTOMER in writing in a timely manner of all existing equipment and materials to be replaced at the Facility Premises as part of the work Work and the University CUSTOMER shall within thirty (30insert days ( ) days designate in writing to the ESCO COMPANY the equipment and materials which should not be disposed of off-site by the ESCOCOMPANY. The ESCO COMPANY shall be responsible for the disposal of all equipment and materials removed or replaced through its performance of the work Work in accordance with all applicable laws and regulations regarding such disposal, except those items designated by the University CUSTOMER as nondisposablenon-disposable . The cost of disposal to be performed by the ESCO COMPANY is included in the ESCO COMPANY compensation for the work Work set forth in Schedule C.C (Compensation to Company).
Appears in 1 contract