Measured Madras Flow Sample Clauses

Measured Madras Flow. The real-time flow release at the USGS Madras gage shall be the most recent 15-minute interval USGS gage reading, converted to flow using the USGS level vs. flow rating table. The real time flow setpoint for the USGS Madras gage shall be the most recent 15-minute interval water level setpoint in the Reregulating Development control system, converted to flow using the USGS level vs. flow rating table. The daily outflow of the Project is defined as the average flow measured at the USGS Madras gage each calendar day. This daily outflow will be calculated from the average of the day’s 96 quarter-hour (15 minute interval) flow release readings.
AutoNDA by SimpleDocs

Related to Measured Madras Flow

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Performance Measures and Metrics This section outlines the performance measures and metrics upon which service under this SLA will be assessed. Shared Service Centers and Customers will negotiate the performance metric, frequency, customer and provider service responsibilities associated with each performance measure. Measurements of the Port of Seattle activities are critical to improving services and are the basis for cost recovery for services provided. The Port of Seattle and The Northwest Seaport Alliance have identified activities critical to meeting The NWSA’s business requirements and have agreed upon how these activities will be assessed.

  • Service Availability You understand that Service availability is at all times conditioned upon the corresponding operation and availability of the communication systems used in communicating your instructions and requests to the Credit Union. We will not be liable or have any responsibility of any kind for any loss or damage thereby incurred by you in the event of any failure or interruption of such communication systems or services resulting from the act or omission of any third party, or from any other cause not reasonably within the control of the Credit Union.

  • EPP service availability Refers to the ability of the TLD EPP servers as a group, to respond to commands from the Registry accredited Registrars, who already have credentials to the servers. The response shall include appropriate data from the Registry System. An EPP command with “EPP command RTT” 5 times higher than the corresponding SLR will be considered as unanswered. If 51% or more of the EPP testing probes see the EPP service as unavailable during a given time, the EPP service will be considered unavailable.

  • Measured Internet Traffic Dial-up, switched Internet Traffic originated by a Customer of one Party on that Party’s network at a point in a Verizon local calling area, and delivered to a Customer or an Internet Service Provider served by the other Party, on that other Party’s network at a point in the same Verizon local calling area. Verizon local calling areas shall be as defined by Verizon. For the purposes of this definition, a Verizon local calling area includes a Verizon non-optional Extended Local Calling Scope Arrangement, but does not include a Verizon optional Extended Local Calling Scope Arrangement. Calls originated on a 1+ presubscription basis, or on a casual dialed (10XXX/101XXXX) basis, are not considered Measured Internet Traffic. For the avoidance of any doubt, Virtual Foreign Exchange Traffic (i.e., V/FX Traffic) (as defined in the Interconnection Attachment) does not constitute Measured Internet Traffic.

  • Therapist Availability Therapist’s office is equipped with a confidential voice mail system that allows Patient to leave a message at any time. Therapist will make every effort to return calls within 24 hours (or by the next business day), but cannot guarantee the calls will be returned immediately. Therapist is unable to provide 24-hour crisis service. In the event that Patient is feeling unsafe or requires immediate medical or psychiatric assistance, he/she should call 911, or go to the nearest emergency room.

  • Baseline For purposes of measuring a reduction in net tax revenue, the interim final rule measures actual changes in tax revenue relative to a revenue baseline (baseline). The baseline will be calculated as fiscal year 2019 (FY 2019) tax revenue indexed for inflation in each year of the covered period, with inflation calculated using the Bureau of Economic Analysis’s Implicit Price Deflator.163 FY 2019 was chosen as the starting year for the baseline because it is the last full fiscal year prior to the COVID– 162 See, e.g., Tax Policy Center, How do state earned income tax credits work?, https:// xxx.xxxxxxxxxxxxxxx.xxx/xxxxxxxx-xxxx/xxx-xx- state-earned-income-tax-credits-work/ (last visited May 9, 2021).

Time is Money Join Law Insider Premium to draft better contracts faster.