MEASUREMENT EXAMPLE Sample Clauses

MEASUREMENT EXAMPLE. 2: Base Hours = 8 AM to 9 PM Monday through Friday over the 12-month Measurement Period. 13 hours x 5 days x 52 weeks = 3,380 Base Hours 3,380 Base Hours – 60 Downtime hours = 3,320 Uptime Hours (3320 / 3380) * 100 = 98.2% Uptime Percentage
AutoNDA by SimpleDocs

Related to MEASUREMENT EXAMPLE

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Performance Measurement Satisfactory performance of this Contract will be measured by:

  • PERFORMANCE MEASUREMENTS Upon a particular Commission’s issuance of an Order pertaining to Performance Measurements in a proceeding expressly applicable to all CLECs generally, BellSouth shall implement in that state such Performance Measurements as of the date specified by the Commission. Performance Measurements that have been Ordered in a particular state can currently be accessed via the internet at xxxx://xxxx.xxxxxxxxx.xxx. The following Service Quality Measurements (SQM) plan as it presently exists and as it may be modified in the future, is being included as the performance measurements currently in place for the state of Tennessee. At such time that the TRA issues a subsequent Order pertaining to Performance Measurements, such Performance Measurements shall supersede the SQM contained in the Agreement. BellSouth Service Quality Measurement Plan‌ (SQM) Tennessee Performance Metrics Measurement Descriptions Version 2.00 Issue Date: July 1, 2003 Introduction

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Performance Metrics In the event Grantee fails to timely achieve the following performance metrics (the “Performance Metrics”), then in accordance with Section 8.4 below Grantee shall upon written demand by Triumph repay to Triumph all portions of Grant theretofore funded to and received by Grantee:

  • Measurements All production shall be accurately measured using standards established by the American Gas Association (AGA) and/or the American Petroleum Institute (API) and all measuring devices shall be tamper proof as nearly as possible. Oil royalties due within the terms of this lease shall be calculated on actual and accurate measurements within API standards unless a different means of measurement, subject to Lessor's approval, is provided.

Time is Money Join Law Insider Premium to draft better contracts faster.