Measuring. Operator shall install, maintain and operate all facilities necessary for the measurement of Petroleum at each Production Measurement Point. Operator shall notify ROC prior to any calibration of such measurement facilities and allow ROC's representatives to attend such calibration activities. Unless agreed otherwise by the Parties, any inaccuracy determined during such calibration activities shall be deemed to have existed since the mid-point between the last calibration and the current calibration.Similarly, Export Oil that may be lifted by Contractor shall be measured at the Delivery Measurement Point in accordance with standard SOMO measurement practices. Operation and calibration of the metering equipment and procedures for measurement and sampling shall be in accordance with the prevailing standards of the international petroleum industry. The Parties shall agree the procedure for measuring the volume and quality of Petroleum and shall have the right of access to Production Measurement Points and the right of witnessing calibration thereof. CLAUSE 7. TRANSPORTATION SYSTEM 7.1 Operator and Contractor shall have no obligation to build transportation facilities downstream of the Transfer Point unless this is agreed and incorporated in a Development Plan. In the event such facilities are built they shall be handed over to Transporter upon completion and commissioning. 7.2 In case a need arises to de-bottleneck, improve the efficiency and/or to increase the capacity of the Transportation System, ROC, Transporter, or Operator may propose to construct facilities beyond the Transfer Point, in addition to or to modify the existing Transportation Facilities. If agreed in a Plan, Operator and Contractor shall participate in the building and financing of the same in proportion to the production from the Contract Area in relation with other users and such participation shall be considered Petroleum Costs. 7.3 In the event that Contractor agrees to finance and build or improve such transportation facilities, Operator shall ensure the participation of Transporter's representatives during engineering and construction of the Transportation Facilities, as well as the training of Transporter's personnel concerning operation and maintenance to be conducted before handing them over to the Transporter. Operator shall provide Transporter with all documents and guarantees relating to the said Transportation Facilities. Operator and Transporter shall agree in advance on a procedure for smooth hand-over of the Transportation Facilities after completion and commissioning.
Appears in 6 contracts
Samples: Exploration, Development and Production Contract, Development and Production Contract, Development and Production Contract
Measuring. Operator shall install, maintain and operate all facilities necessary for the measurement of Petroleum at each Production Measurement Point. Operator shall notify ROC prior to any calibration of such measurement facilities and allow ROC's representatives to attend such calibration activities. Unless agreed otherwise by the Parties, any inaccuracy determined during such calibration activities shall be deemed to have existed since the mid-point between the last calibration and the current calibration.. Similarly, Export Oil that may be lifted by Contractor shall be measured at the Delivery Measurement Point in accordance with standard SOMO measurement practices. Operation and calibration of the metering equipment and procedures for measurement and sampling shall be in accordance with the prevailing standards of the international petroleum industry. The Parties shall agree the procedure for measuring the volume and quality of Petroleum and shall have the right of access to Production Measurement Points and the right of witnessing calibration thereof. CLAUSE 78. TRANSPORTATION SYSTEM
7.1 8.1 Unless related to obligations under Annex E, Operator and Contractor shall have no obligation to build transportation facilities downstream of the Transfer Point unless this is agreed and incorporated in a Development Plan. In the event such facilities are built they shall be handed over to Transporter upon completion and commissioning.
7.2 8.2 In case a need arises to de-bottleneck, improve the efficiency and/or to increase the capacity of the Transportation System, ROC, Transporter, or Operator may propose to construct facilities beyond the Transfer Point, in addition to or to modify the existing Transportation Facilities. If agreed in a Plan, Operator and Contractor shall participate in the building and financing of the same in proportion to the production from the Contract Area in relation with other users and such participation shall be considered Petroleum Supplementary Costs.
7.3 8.3 In the event that Contractor agrees to finance and build or improve such transportation facilities, Operator shall ensure the participation of Transporter's representatives during engineering and construction of the Transportation Facilities, as well as the training of Transporter's personnel concerning operation and maintenance to be conducted before handing them over to the Transporter. Operator shall provide Transporter with all documents and guarantees relating to the said Transportation Facilities. Operator and Transporter shall agree in advance on a procedure for smooth hand-over of the Transportation Facilities after completion and commissioning.
Appears in 2 contracts
Samples: Development and Production Service Contract, Gas Development and Production Service Contract
Measuring. Operator shall install, maintain and operate all facilities necessary for the measurement of Petroleum at each Production Measurement Point. Operator shall notify ROC NOC prior to any calibration of such measurement facilities and allow ROCNOC's representatives to attend such calibration activities. Unless agreed otherwise by the Parties, any inaccuracy determined during such calibration activities shall be deemed to have existed since the mid-point between the last calibration and the current calibration.. Similarly, Export Oil that may be lifted by Contractor shall be measured at the Delivery Measurement Point in accordance with standard SOMO measurement practices. Operation and calibration of the metering equipment and procedures for measurement and sampling shall be in accordance with the prevailing standards of the international petroleum industry. The Parties shall agree the procedure for measuring the volume and quality of Petroleum and shall have the right of access to Production Measurement Points and the right of witnessing calibration thereof. CLAUSE 78. TRANSPORTATION SYSTEM
7.1 8.1 Unless related to obligations under Annex E, Operator and Contractor shall have no obligation to build transportation facilities downstream of the Transfer Point unless this is agreed and incorporated in a Development Plan. In the event such facilities are built they shall be handed over to Transporter upon completion and commissioning.
7.2 8.2 In case a need arises to de-bottleneck, improve the efficiency and/or to increase the capacity of the Transportation System, ROCNOC, Transporter, or Operator may propose to construct facilities beyond the Transfer Point, in addition to or to modify the existing Transportation Facilities. If agreed in a Plan, Operator and Contractor shall participate in the building and financing of the same in proportion to the production from the Contract Area in relation with other users and such participation shall be considered Petroleum Supplementary Costs.
7.3 8.3 In the event that Contractor agrees to finance and build or improve such transportation facilities, Operator shall ensure the participation of Transporter's representatives during engineering and construction of the Transportation Facilities, as well as the training of Transporter's personnel concerning operation and maintenance to be conducted before handing them over to the Transporter. Operator shall provide Transporter with all documents and guarantees relating to the said Transportation Facilities. Operator and Transporter shall agree in advance on a procedure for smooth hand-over of the Transportation Facilities after completion and commissioning.
Appears in 1 contract
Measuring. Operator shall install, maintain and operate all facilities necessary for the measurement of Petroleum at each Production Measurement Point. Operator shall notify ROC prior to any calibration of such measurement facilities and allow ROC's representatives to attend such calibration activities. Unless agreed otherwise by the Parties, any inaccuracy determined during such calibration activities shall be deemed to have existed since the mid-point between the last calibration and the current calibration.. Similarly, Export Oil that may be lifted by Contractor shall be measured at the Delivery Measurement Point in accordance with standard SOMO measurement practices. Operation and calibration of the metering equipment and procedures for measurement and sampling shall be in accordance with the prevailing standards of the international petroleum industry. The Parties shall agree the procedure for measuring the volume and quality of Petroleum and shall have the right of access to Production Measurement Points and the right of witnessing calibration thereof. CLAUSE 7. TRANSPORTATION SYSTEM
7.1 Operator and Contractor shall have no obligation to build transportation facilities downstream of the Transfer Point unless this is agreed and incorporated in a Development Plan. In the event such facilities are built they shall be handed over to Transporter upon completion and commissioning.
7.2 In case a need arises to de-bottleneck, improve the efficiency and/or to increase the capacity of the Transportation System, ROC, Transporter, or Operator may propose to construct facilities beyond the Transfer Point, in addition to or to modify the existing Transportation Facilities. If agreed in a Plan, Operator and Contractor shall participate in the building and financing of the same in proportion to the production from the Contract Area in relation with other users and such participation shall be considered Petroleum Costs.
7.3 In the event that Contractor agrees to finance and build or improve such transportation facilities, Operator shall ensure the participation of Transporter's representatives during engineering and construction of the Transportation Facilities, as well as the training of Transporter's personnel concerning operation and maintenance to be conducted before handing them over to the Transporter. Operator shall provide Transporter with all documents and guarantees relating to the said Transportation Facilities. Operator and Transporter shall agree in advance on a procedure for smooth hand-over of the Transportation Facilities after completion and commissioning.
Appears in 1 contract
Samples: Exploration, Development and Production Service Contract