Meeting Frequency, Location and Times Sample Clauses

Meeting Frequency, Location and Times. Frequency: Once a term Dates: Dates are published via the Education Services Portal Location: CEME, Xxxxx Xxx, Xxxxxxx, Xxxxx XX00 0XX Quorum: EYPRG quorum is a minimum of half the Non-Local Authority members. Meeting minutes are produced and made available to the representatives, the Early Years Sector and published on the Havering website at xxx.xxxxxxxx.xxx.xx/xxxxx.
AutoNDA by SimpleDocs
Meeting Frequency, Location and Times. Frequency: Once a term Dates: Dates are published via the Education Services Portal Location: CEME, Xxxxx Way, Rainham, Essex RM13 8EU Quorum: EYPRG quorum is a minimum of half the Non-Local Authority members. Meeting minutes are produced and made available to the representatives, the Early Years Sector and published on the Havering website at xxx.xxxxxxxx.xxx.xx/xxxxx.

Related to Meeting Frequency, Location and Times

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Data Location 1.1. The CONTRACTOR shall not store or transfer non-public COUNTY data outside of the United States. This includes backup data and Disaster Recovery locations. The CONTRACTOR will permit its personnel and contractors to access COUNTY data remotely only as required to provide technical support. (Remote access to data from outside the continental United States is prohibited unless approved in advance and in writing by the County.)

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Scaling Locations, Rules, and Organizations All logs from timber sold under the terms and conditions of this contract shall be: (1) scaled at a location approved in writing by STATE; (2) scaled by a third-party scaling organization with a current agreement with STATE; and (3) scaled using the Official Log Scaling and Grading Rules (as adopted by the Northwest Log Rules Advisory Group) and STATE special service scaling instructions in effect at the time the logs are scaled. Utilization scale shall be handled in accordance with the section titled, “Utilization Scale.” PURCHASER shall enter into a written agreement with a third-party scaling organization for the scaling of logs removed from the timber sale area. PURCHASER shall furnish STATE with a copy of the scaling agreement upon request. If logs are delivered when a TPSO scaler is not present, PURCHASER must provide STATE with a method to assure protection and accountability. PURCHASER shall provide STATE with remote check scaling opportunities for logs scaled under this contract. The last two loads at each delivery point shall be continuously available for checking. They shall remain available for a minimum of 48 hours unless replaced by other STATE loads. They shall be available as originally presented for scaling; i.e., if truck scaled, they shall be presented in bunks. In the event scaling is suspended for any reason, hauling operations shall be immediately suspended until approved alternate scaling services are provided, or service by the scaling organization is resumed.

Time is Money Join Law Insider Premium to draft better contracts faster.