Memory-Coalescing Optimization Sample Clauses

Memory-Coalescing Optimization. ‌ This section presents a transformation that fixes potential un- coalesced accesses of a map construct, such as map fun inp, where the elements of inp are arrays of similar dimensionality. ≡ One can observe that since map hides the iteration space, any array indexing inside fun would likely be invariant to the loop that implements map. For example, in the left side of Figure 8, DOALL i corresponds to the original map, and the DO j loop implements fun, which processes an inner array of dimension M, indexed by σ(j). Executing the i loop on GPU leads to the access pattern depicted in the left-bottom part of Figure 8, in which B cores in a SIMD-group access in one instruction elements that are 4*M bytes apart from each other, where we assumed for simplicity σ id. We fix this behavior by reshaping uniformly such arrays via transformation T([x,y]) = [x/B,y,x%B], in which x and y cor- respond to the row and column index in the original matrix (since Fortran uses column order, we would write ARR(y,x)). Since B is a power of two the new index is computed using fast arithmetic. In essence, we have trimmed the outermost dimension and added an innermost (row) dimension of size B, the size of the SIMD group, such that one SIMD instruction exhibits coalesced access. The top-right part of Figure 8 shows the transformed code, where we made explicit the SIMD grouping via the DOALL k loop, while the outer DOALL i loop expresses the parallelism among SIMD groups. The bottom-right part of Figure 8 demonstrates that after transformation B consecutive cores access contiguous locations. We observe that this transformation is effective for arrays of any dimensions, as long as the internal indexing is map-loop invariant. For example, assuming that the Brownian-bridge code of Figure 4 is written in map-reduce style, i.e., array expansion is applied to wf and zd, this transformation results in coalesced accesses for arrays wf and zd, despite the indirect indexing exhibited on the dates
AutoNDA by SimpleDocs

Related to Memory-Coalescing Optimization

  • Treatment Program Testing The Employer may request or require an employee to undergo drug and alcohol testing if the employee has been referred by the employer for chemical dependency treatment or evaluation or is participating in a chemical dependency treatment program under an employee benefit plan, in which case the employee may be requested or required to undergo drug or alcohol testing without prior notice during the evaluation or treatment period and for a period of up to two years following completion of any prescribed chemical dependency treatment program.

  • Annual Production Program document describing the forecasts for Production and handling of Oil, Gas, water, special fluids, and waste arising from the Production process of each Development Area or Field.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • Hepatitis B Vaccine Where the Hospital identifies high risk areas where employees are exposed to Hepatitis B, the Hospital will provide, at no cost to the employees, a Hepatitis B vaccine.

  • Screening 3.13.1 Refuse containers located outside the building shall be fully screened from adjacent properties and from streets by means of opaque fencing or masonry walls with suitable landscaping.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Library CONTRACTOR shall provide an inmate law library in compliance with Rule 33-501.301, F.A.C., FDC’s Policy 501.301, and ACA Standards.

Time is Money Join Law Insider Premium to draft better contracts faster.