Methods of Ingress or Egress Sample Clauses

Methods of Ingress or Egress. Authority may at any time temporarily or permanently close, re-route, or consent to or request the closing or re-routing of any method of ingress or egress on Airport, so long as a means of ingress and egress reasonably equivalent is concurrently made available to Company. Company hereby releases and discharges Authority from any and all claims, demands, or causes of action that Company may now or at any time hereafter have arising or alleged to arise out of such a closing or re-routing.
AutoNDA by SimpleDocs
Methods of Ingress or Egress. The Authority may at any time temporarily or permanently close, re-route, consent to, or request the closing or re-routing of any method of ingress to or egress from Airport, so long as a substantially equivalent means of ingress and egress is concurrently made available to Company. Company hereby releases and discharges the Authority from any and all claims, demands, or causes of action that Company may have arising out of such a closing or re-routing. DocuSign Envelope ID: 592E0882-A82A-48D1-B8F8-29D404B52E52
Methods of Ingress or Egress. Authority may at any time temporarily or permanently close, re-route, or consent to or request the closing or re-routing of any method of ingress or egress on Airport, so long as a means of ingress and egress reasonably equivalent is concurrently made available to Company. Company hereby releases and discharges Authority from any and all claims, demands, or causes of action that North Cargo Space Rental Agreement - 27 - September 28, 2017 LGSTX SERVICES, INC. Company may now or at any time hereafter have arising or alleged to arise out of such a closing or re-routing.
Methods of Ingress or Egress. Authority may at any time temporarily or permanently close, re-route, or consent to or request the closing or re-routing of any method of ingress or egress on Airport, so long as a means of ingress and egress reasonably equivalent is concurrently made available to City. City hereby releases and discharges Authority from any and all claims, demands, or causes of action that City may now or at any time hereafter have arising or alleged to arise out of such a closing or re-routing.

Related to Methods of Ingress or Egress

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Access to Project Site ‌ City will make available, no later than the commencement date designated in the current construction Schedule accepted by City, the lands and facilities upon which the Work is to be performed, including such access and other lands and facilities designated in the Contract Documents, for use by Contractor.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection. 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by PNG.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing CSTC traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to CSTC, the subtending arrangements between CSTC Tandem Switches and CSTC End Office Switches shall be the same as the Tandem/End Office subtending arrangements that CSTC maintains for the routing of its own or other carriers’ traffic.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.