Methods of taking? Sample Clauses

Methods of taking?. In Uzbekistan the sportive hunting is presented and hunting with hunting guns is allowed. Catching of water-birds is conducted in the special cases (for zoos, etc.) and needed the special procedures and permissions.
AutoNDA by SimpleDocs

Related to Methods of taking?

  • Methods of Payment Distributions from the Director's Deferral Accounts shall be paid in cash in a single sum unless the Participant elects, at the time a Payment Date is selected pursuant to paragraph 4.1(a) or 4.1(b), to receive the amount payable in generally equal quarterly installments over a period not to exceed ten (10) years. In addition, at least one year before the Payment Date, a Director may change the method of payment previously selected.

  • Methods of Measurement The methods used to identify the educational strengths and needs of students are set forth in the approved Application.

  • METHODS OF CALCULATION 1. Bi-Weekly 158. An employee whose compensation is fixed on a bi-weekly basis shall be paid the bi-weekly salary for his/her position for work performed during the bi-weekly pay period. There shall be no compensation for time not worked unless such time off is authorized time off with pay.

  • Methods of Interconnection The Parties will negotiate the facilities arrangement used to interconnect their respective networks. CLEC shall establish at least one (1) physical Point of Interconnection in CenturyLink territory in each LATA CLEC has local End User Customers. CLEC represents and warrants that it is serving End User Customers physically located within each local calling area for which it wishes to exchange traffic within CenturyLink territory. The Parties shall establish, through negotiations, at least one (1) of the following Interconnection arrangements, at any Technically Feasible point: (1) a DS1 or DS3 CenturyLink-provided facility; (2) Collocation; (3) negotiated Mid-Span Meet POI facilities; or (4) other Technically Feasible methods of Interconnection via the Bona Fide Request (BFR) process unless a particular arrangement has been previously provided to a third party, or is offered by CenturyLink as a product.

  • Methods i. Brief description of the method used.

  • ADJUSTMENT/APPROPRIATION OF PAYMENTS The Allottee authorizes the Promoter to adjust/appropriate all payments made by him/her under any head(s) of dues against lawful outstanding, if any, in his/her name as the Promoter may in its sole discretion deem fit and the Allottee undertakes not to object/demand/direct the Promoter to adjust his payments in any manner.

  • DRESS 6.1 Players shall be required to provide and wear their own playing shirts for the Event (“Event Shirts”); which must be worn throughout the Event and in any promotional work associated to the Event with dark smart trousers and plain black shoes/smart black sneakers. No waistcoats (vests), bow ties, denim jeans, t-shirts, jackets or sports shoes will be permitted.

  • Method The Competent Authorities intend to use the International Data Exchange Service (“IDES”), as reflected in the FATCA IDES User Guide (IRS Publication 5190) and the FATCA Metadata XML Schema User Guide (IRS Publication 5188) posted on XXX.xxx, for all exchange of information, including notices described in Paragraph 4.3, pursuant to the IGA.

  • Other Methods of Procurement of Consultants’ Services The following table specifies methods of procurement, other than Quality and Cost-based Selection, which may be used for consultants’ services. The Procurement Plan shall specify the circumstances under which such methods may be used. Procurement Method

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

Time is Money Join Law Insider Premium to draft better contracts faster.