MINIMUM VERTICAL CLEARANCE BETWEEN CONDUCTORS ON Sample Clauses

MINIMUM VERTICAL CLEARANCE BETWEEN CONDUCTORS ON. SAME STRUCTURE
AutoNDA by SimpleDocs

Related to MINIMUM VERTICAL CLEARANCE BETWEEN CONDUCTORS ON

  • CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Excellent Above Average Satisfactory Needs Improvement Unsatisfactory 5 4 3 2 1 5. The instructor demonstrates knowledge of the subject matter.

  • Xxxxxxxx, 121 Cal App.4th Supp. 7 (2004), CIV Code 1962 Colorado $50.00 or 5% of past due rent C.R.S. § 00-00-000 Connecticut Not defined No statute Delaware 5% of the monthly rent amount Title 25, § 5501(d) Florida Not defined No statute Georgia “All contracts for rent shall bear interest from the time the rent is due” Hawaii 8% of the monthly rent amount § 521-21(f) Idaho Not defined No statute Illinois Outside Chicago – Not defined Chicago only – $10.00 per month for the first $500.00 in monthly rent plus five percent per month for any amount in excess of $500.00 in monthly rent for the late payment of rent. No statute 5-12-140(h) Indiana Not defined No statute Iowa If the rent does not exceed $700/month, the late fee cannot exceed more than $12/day per day or $60/month. If the rent is greater than $700/month, the late cannot exceed more than $20/day or $100/month.

  • DNS name server availability Refers to the ability of a public-­‐DNS registered “IP address” of a particular name server listed as authoritative for a domain name, to answer DNS queries from an Internet user. All the public DNS-­‐registered “IP address” of all name servers of the domain name being monitored shall be tested individually. If 51% or more of the DNS testing probes get undefined/unanswered results from “DNS tests” to a name server “IP address” during a given time, the name server “IP address” will be considered unavailable.

  • Einwilligung Zur Verwendung Von Daten A. Analysedaten. Wenn du dich entscheidest, die Sammlung von Analysedaten zuzulassen, erklärst du dein Einverständnis damit, dass Apple, seine Tochtergesellschaften und Auftragnehmer Diagnosedaten sowie technische, nutzungsrelevante und zugehörige Informationen, einschließlich insbesondere eindeutige System- oder Hardwarekennungen, Informationen über deinen Computer, deine Systemsoftware und Softwareprogramme sowie deine Peripheriegeräte sammeln, verwalten, verarbeiten und verwenden dürfen. Diese Informationen werden regelmäßig gesammelt, um Produkte und Dienste von Apple bereitzustellen und zu verbessern, die Bereitstellung von Softwareaktualisierungen, Produktsupport und anderen Diensten für dich (sofern vorhanden) in Verbindung mit der Apple-Software zu vereinfachen und um die Einhaltung der Bestimmungen dieses Lizenzvertrags zu überprüfen. Du kannst deine Einstellungen für die Analyse jederzeit ändern, indem du auf deinem Computer zur Einstellung „Analyse“ navigierst und das Markierungsfeld deaktivierst. Die Einstellung „Analyse“ befindet sich in der Systemeinstellung „Sicherheit“ im Bereich „Privatsphäre“. Apple ist berechtigt, diese Informationen zu nutzen, sofern diese für die oben beschriebenen Zwecke in einer Form gesammelt werden, die keinerlei Rückschlüsse auf deine Person zulässt. Damit Partner und Fremdentwickler von Apple die Möglichkeit erhalten, ihre für die Nutzung mit Apple-Produkten ausgelegte(n) Software, Hardware und Dienste zu optimieren, stellt Apple solchen Partnern oder Fremdentwicklern möglicherweise einen Teil seiner Diagnoseinformationen bereit, der für die Software, Hardware und/oder Dienste dieses Partners oder Entwicklers relevant ist, vorausgesetzt, diese Informationen werden in einer Form verwendet, die keinerlei Rückschlüsse auf deine Person zulässt.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

Time is Money Join Law Insider Premium to draft better contracts faster.