Common use of Monitoring of Contract Clause in Contracts

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.

Appears in 9 contracts

Samples: Rate Contract for Hiring of Legal Professional Services, Rate Contract for Supply of Usb Cryptographic Tokens, Rate Contract for Supply of Usb Cryptographic Tokens

AutoNDA by SimpleDocs

Monitoring of Contract. a) a. An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) b. During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) c. If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) d. Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) e. No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.

Appears in 3 contracts

Samples: Rate Contract RFP for Development and FMS of Web Portals & Websites in Aem, Rate Contract RFP for Development and FMS of Web Portals & Websites in Aem, Rate Contract RFP for Development and FMS of Web Portals & Websites in Aem

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.

Appears in 3 contracts

Samples: Rate Contract for Supply, Installation, Commissioning and Maintenance of GPS Devices, Rate Contract for Supply, Installation, Commissioning and Maintenance of GPS Devices, Supply Agreement

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s bidder‟s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s bidder‟s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Setting up of IT Fun City (Interactive Digital Amusement Gallery) at Jaipur

Appears in 2 contracts

Samples: Rate Contract, Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for Rate Contract for Selection of Logistic Partner for e-Bazaar acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Selection of Logistic Partner for e-Bazaar

Appears in 2 contracts

Samples: Rate Contract for Selection of Logistic Partner, Rate Contract for Selection of Logistic Partner

Monitoring of Contract. a(i) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b(ii) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c(iii) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d(iv) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e(v) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.

Appears in 2 contracts

Samples: Rate Contract, Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract (After Pre-bid) for Various Surveillance items to be deployed in the State of Rajasthan

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s bidder‟s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s bidder‟s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. RISL Final Rate Contract for Establishing Smart Classroom (After Pre-bid)

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for Rate Contract for GPU based Workstations for WS&APS with Five Years O&M acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for GPU based Workstations for WS&APS with Five Years O&M

Appears in 1 contract

Samples: Rate Contract for Gpu Based Workstations for Ws&aps With Five Years O&m

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Setting up of Interactive Digital Amusement Gallery at Permanent Centers (Digital Museum)

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods items/item/articles and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods items/item/articles and service is to be obtained continuously or is batched. If the entire quantity of goods items/item/articles and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods items/item/articles and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof there of to any other agency without the permission of procuring entity.

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Supply of Digital Signature Certificates (with USB Tokens) and Server SSL Certificates

Appears in 1 contract

Samples: Rate Contract for Supply of Digital Signature Certificates and Server SSL Certificates

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not may, with prior permission of the procuring authority, assign or sub-let his only the Operations and Maintenance part of this contract or any substantial part thereof to any other agency without fulfilling the permission of procuring entity.following pre-conditions:

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) a. An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery deployment period. b) b. During the delivery period deployment period, the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery resource deployment is in proportion to the total delivery deployment period given, given if it is a severable contract, in which the delivery deployment of the goods resources and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched watched, and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) c. If delay in delivery deployment of goods resources and service is observed observed, a performance notice would be given to the selected bidder to speed up the deliverydeployment. d) d. Any change in the constitution of the firm, etc. shall be notified forth with forthwith by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) e. No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) f. The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of the procuring entity.

Appears in 1 contract

Samples: Rate Contract for Supply of Usb Cryptographic Token

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate contract for Printing and Delivery of PVC Cards and other documents (Before Pre-Bid)

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Supply, installation and commissioning of additional Edge equipment’s under Surveillance and Incident Response Project in the State of Rajasthan (After Pre-bid)

Appears in 1 contract

Samples: Rate Contract for Supply, Installation and Commissioning

AutoNDA by SimpleDocs

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Various Surveillance items to be deployed in the State of Rajasthan

Appears in 1 contract

Samples: Rate Contract for Various Surveillance Items

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Supply, Installation and FMS of Edge equipment’s under City Surveillance project for seven Cities (After Pre-bid)

Appears in 1 contract

Samples: Rate Contract for Supply, Installation and FMS of Edge Equipment’s Under City Surveillance Projects

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Setting up of Interactive Digital Amusement Gallery during various events

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Proc. of MS-Exchange Server Licenses, Device CALs including Support Services

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract.. Final RFP-Rate Contract for Selection of Logistic Partner for e-Bazaar f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Final RFP-Rate Contract for Selection of Logistic Partner for e-Bazaar

Appears in 1 contract

Samples: Rate Contract for Logistic Partner

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Supply, Installation, commissioning and FMS of Edge equipment’s under Surveillance and Incident Response Project in the State of Rajasthan

Appears in 1 contract

Samples: Rate Contract for Supply, Installation, Commissioning and FMS of Edge Equipment

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidderxxxxxx’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.

Appears in 1 contract

Samples: Rate Contract for Supply of Digital Signature Certificates and Server SSL Certificates

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s bidder‟s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s bidder‟s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Setting up of Interactive Digital Amusement Gallery during various events

Appears in 1 contract

Samples: Rate Contract

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof to any other agency without the permission of procuring entity.. Rate Contract for Selection of Logistic Partner for e-Bazaar

Appears in 1 contract

Samples: Rate Contract for Selection of Logistic Partner

Monitoring of Contract. a) An officer or a committee of officers named Contract Monitoring Committee (CMC) may be nominated by procuring entity to monitor the progress of the contract during its delivery period. b) During the delivery period the CMC shall keep a watch on the progress of the contract and shall ensure that quantity of goods and service delivery is in proportion to the total delivery period given, if it is a severable contract, in which the delivery of the goods and service is to be obtained continuously or is batched. If the entire quantity of goods and service is to be delivered in the form of completed work or entire contract like fabrication work, the process of completion of work may be watched and inspections of the selected bidder’s bidder‟s premises where the work is being completed may be inspected. c) If delay in delivery of goods and service is observed a performance notice would be given to the selected bidder to speed up the delivery. d) Any change in the constitution of the firm, etc. shall be notified forth with by the contractor in writing to the procuring entity and such change shall not relieve any former member of the firm, etc., from any liability under the contract. e) No new partner/ partners shall be accepted in the firm by the selected bidder in respect of the contract unless he/ they agree to abide by all its terms, conditions and deposits with the procuring entity through a written agreement to this effect. The bidder’s bidder‟s receipt for acknowledgement or that of any partners subsequently accepted as above shall bind all of them and will be sufficient discharge for any of the purpose of the contract. f) The selected bidder shall not assign or sub-let his contract or any substantial part thereof there of to any other agency without the permission of procuring entity.

Appears in 1 contract

Samples: Rate Contract