New Reservoirs Sample Clauses

New Reservoirs. When a new reservoir is to be included in the regulation, use the estimate of the reservoir’s expected elevation for the July 31 preceding the first Critical Period in which such reservoir is included pursuant to this Agreement as a Firm Resource of such Reservoir Party which the Reservoir Party shall provide to each of the other Parties.
AutoNDA by SimpleDocs
New Reservoirs. No New Reservoir shall be constructed anywhere within the LCR Watershed outside of the Navajo Reservation or the Hopi Reservation except as provided in this Subparagraph 7.5.1. A New Reservoir may be constructed within the LCR Watershed outside of the Navajo Reservation or the Hopi Reservation provided that the New Reservoir: 7.5.1.1 is wholly contained within a Closed Basin; or 7.5.1.2 is located within the Lower LCR Watershed and the Surface Water stored is used primarily for Municipal Uses; or 7.5.1.3 stores Surface Water that became available for storage as a result of a change in place or type of use, or change in point of Diversion, and such change does not harm other Water Right holders; or 7.5.1.4 has no permanent water storage, and is operated solely for flood control purposes.

Related to New Reservoirs

  • Ditches (1) Remove bank slough, minor slides, and obstructions. (2) Remove slash created by operations. (3) Restore to functional drainage. (4) Minimize erosion and/or sediment delivery by placement and maintenance of filtering systems.

  • Trees 1.1. The Tenant shall not without the written consent of the Council cut or prune any trees, apart from carrying out the recognised pruning practices of fruit trees. 1.2. The Tenant shall not plant any trees other than dwarf fruiting trees and or fruiting bushes without the prior consent of the Council.

  • Loop Reservations 2.9.3.1 For a Mechanized LMUSI, Comm South may reserve up to ten (10) Loop facilities. For a Manual LMUSI, Comm South may reserve up to three (3) Loop facilities. 2.9.3.2 Comm South may reserve facilities for up to four (4) business days for each facility requested through LMU from the time the LMU information is returned to Comm South. During and prior to Comm South placing an LSR, the reserved facilities are rendered unavailable to other customers, including BellSouth. If Comm South does not submit an LSR for a UNE service on a reserved facility within the four (4)-day reservation timeframe, the reservation of that spare facility will become invalid and the facility will be released. 2.9.3.3 Charges for preordering Manual LMUSI or Mechanized LMU are separate from any charges associated with ordering other services from BellSouth. 2.9.3.4 All LSRs issued for reserved facilities shall reference the facility reservation number as provided by BellSouth. Comm South will not be billed any additional LMU charges for the Loop ordered on such LSR. If, however, Comm South does not reserve facilities upon an initial LMUSI, Comm South’s placement of an order for an advanced data service type facility will incur the appropriate billing charges to include SI and reservation per Exhibit A of this Attachment. 2.9.3.5 Where Comm South has reserved multiple Loop facilities on a single reservation, Comm South may not specify which facility shall be provisioned when submitting the LSR. For those occasions, BellSouth will assign to Comm South, subject to availability, a facility that meets the BellSouth technical standards of the BellSouth type Loop as ordered by Comm South.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!