No-Build Scenario Sample Clauses

No-Build Scenario. Consultant shall analyze future conditions under a no-build scenario for both automobile and non-automobile transportation. The no-build scenario must follow the same format and contain the same information as in Tech Memo 4. The future no-build traffic volumes will be generated by the travel demand model and supplied to the Consultant by TPAU. Consultant shall post-process the data.
AutoNDA by SimpleDocs

Related to No-Build Scenario

  • FABRICATION Making up data or results and recording or reporting them.

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • Loop Provisioning Involving IDLC 2.16.1 Where TWTC has requested an Unbundled Loop and AT&T uses IDLC systems to provide the local service to the customer and AT&T has a suitable alternate facility available, AT&T will make such alternative facilities available to TWTC. If a suitable alternative facility is not available, then to the extent it is technically feasible, AT&T will implement one of the following alternative arrangements for TWTC (e.g., hairpinning):

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Workload An employee who believes that her workload is unsafe or consistently excessive shall discuss the problem with her immediate supervisor. If the problem is not resolved in this discussion, the employee may seek a remedy by means of the grievance procedure. If the matter is not resolved in the grievance procedure, it may be referred to troubleshooter who shall:

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

  • Mid Span Fiber Meet a. The Parties may interconnect at a Mid Span Fiber Meet subject to the following terms and conditions:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.