NOTICE OF ACCIDENTS 20.01 Tenant shall give notice to Landlord, promptly after Tenant learns thereof, of (i) any accident in or about the Demised Premises for which Landlord might be liable, (ii) all fires in the Demised Premises, (iii) all damages to or defects in the Demised Premises, including the fixtures, equipment and appurtenances thereof, for the repair of which Landlord might be responsible, and (iv) all damage to or defects in any parts or appurtenances of the Building’s sanitary, electrical, heating, ventilating, air-conditioning, elevator and other systems located in or passing through the Demised Premises or any part thereof.
Notice of Defects If, based on Consulting Engineer/Architect's involvement during the construction phase, Consulting Engineer/Architect observes or otherwise becomes aware of any defect in the work, he shall give prompt written notice to City of such defects and their approximate location on the Project. However, Consulting Engineer/Architect shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions, inspections and programs in connection with the work, since these are solely the contractor's responsibility under the contract for construction. Consulting Engineer/Architect shall not be responsible for the contractor's schedules or failure to carry out the work in accordance with the Contract Documents. Consulting Engineer/Architect shall not have control over or charge of acts or omissions of the contractor, contractor's subcontractors, or their agents or employees.
Correction of Defects 35.1 The Engineer shall give notice to the Contractor of any Defects before the end of the Defects Liability Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period shall be extended for as long as Defects remain to be corrected. 35.2 Every time notice of a Defect is given, the Contractor shall correct the notified Defect within the length of time specified by the Engineer’s notice.
Latent Defects Notwithstanding anything to the contrary set forth herein, no acceptance, or deemed acceptance, by City pursuant to this Section shall be applicable with respect to any Latent Defects. An acceptance, or deemed acceptance, by City pursuant to this Section shall not mean that City has accepted, or the other party has been relieved of, responsibility for: (i) compliance with the Laws; (ii) the proper application of construction means or methods; or (iii) correcting any portion of the Project if it later is determined that any portion of the Project is inconsistent with the Final Documents and Drawings.
REMEDY OF DEFECTS (a) The BUILDER shall remedy, at its expense, any defects, against which the VESSEL is guaranteed under this Article, by making all necessary repairs or replacements at the SHIPYARD or elsewhere as provided for in (b) hereinbelow. In such case, the VESSEL shall be taken at the BUYER's cost and responsibility to the place selected, ready in all respects for such repairs or replacements and in any event, the BUILDER shall not be responsible for towage, dockage, wharfage, port charges and anything else incurred for the BUYER's getting and keeping the VESSEL ready for such repairing or replacing. (b) However, if it is impractical (which shall include, but not be limited to, an emergency) to bring the VESSEL to the SHIPYARD, the BUYER may cause the necessary repairs or replacements to be made elsewhere which is deemed by the BUYER with the consent of the BUILDER which shall not be unreasonably withheld, to be suitable for the purpose, provided that, in such event, the BUILDER may forward or supply replacement parts or materials under the terms described in (c) hereinbelow, unless forwarding or supplying thereof under the terms described in (c) hereinbelow would impair or delay the operation or working schedule of the VESSEL. In the event that the BUYER proposes to cause the necessary repairs or replacements to be made to the VESSEL at any shipyard or works other than the SHIPYARD, the BUYER shall first (but in all events as soon as reasonably possible) give the BUILDER notice by email or facsimile of the time and place such repairs will be made, and if the VESSEL is not thereby delayed, or her operation or working schedule is not thereby impaired, the BUILDER shall have the right to verify by its own representative(s) the nature and extent of the defects complained of. The BUILDER shall, in such case, promptly advise the BUYER by email or facsimile, after such examination has been completed, of its acceptance or rejection of the defects as ones that are covered by the guarantee herein provided. Upon the BUILDER's acceptance of the defects as justifying remedy under this Article, or upon award of the arbitration so determining, the BUILDER shall compensate the BUYER an amount equal to the reasonable cost of making the same repairs or replacements at the SHIPYARD. (c) In the event that it is necessary for the BUILDER to forward a replacement for a defective part under this guarantee, replacement parts shall be shipped to the BUYER under the C.I.F terms to the BUYER's nominated port. The BUILDER reserves the option to retrieve, at the BUILDER's cost, any of the replaced equipment/parts in case defects are remedied in accordance with the provisions in this Article. (d) Any dispute under this Article shall be referred to arbitration in accordance with the provisions of Article XIII hereof.
Notice of Title Defects (a) If Buyer discovers any Title Defect affecting any Asset, Buyer shall notify Seller as promptly as possible, but no later than the expiration of the Examination Period of such alleged Title Defect. To be effective, such notice must (i) be in writing, (ii) be received by Seller by 5:00 p.m. Central Standard Time on the expiration date of the Examination Period and (iii) describe the Title Defect in reasonable detail, to the extent then reasonably known by Buyer (including the estimated value of such Title Defect as determined by Buyer). Any matters that may otherwise constitute Title Defects, but of which Seller has not been notified by Buyer in accordance with the foregoing, shall be deemed to have been waived by Buyer for all purposes and shall constitute Permitted Encumbrances. (b) Upon the receipt of such effective notice from Buyer, Seller, at Seller’s option, shall (i) subject to Section 3.05(a), attempt to cure such Title Defect at any time prior to the Closing or (ii) exclude the affected Asset from the sale and reduce the Purchase Price by the Allocated Value of such affected Asset as set forth on Exhibit C. (c) The value attributable to each Title Defect (the “Title Defect Value”) that is asserted by Buyer in the Title Defect notices shall be determined based upon the criteria set forth below: (i) If the Title Defect is a lien upon any Asset, the Title Defect Value is the amount reasonably expected to be necessary to be paid to remove the lien from the affected Asset. (ii) If the Title Defect asserted is that the Net Revenue Interest attributable to any Well or unit or Well location is less than that stated in Exhibit C or the Working Interest attributable to any Well or unit or Well location is greater than that stated in Exhibit C, then the Title Defect Value shall take into account the relative change in the interest from Exhibit C and the appropriate Allocated Value attributed to such Asset. (iii) If the Title Defect represents an obligation, encumbrance, burden or charge upon the affected Asset (including any increase in Working Interest for which there is not a proportionate increase in Net Revenue Interest) for which the economic detriment to Buyer is unliquidated, the amount of the Title Defect Value shall be determined by taking into account the Allocated Value of the affected Asset, the portion of the Asset affected by the Title Defect, the legal effect of the Title Defect, the potential discounted economic effect of the Title Defect over the life of the affected Asset. (iv) If a Title Defect is not in effect or does not adversely affect an Asset throughout the entire productive life of such Asset, such fact shall be taken into account in determining the Title Defect Value. (v) The Title Defect Value shall be determined without duplication of any costs or losses included in another Title Defect Value hereunder. (vi) Notwithstanding anything herein to the contrary, in no event shall a Title Defect Value exceed the Allocated Value of the Wxxxx, units or other Assets affected thereby. (vii) Such other factors as are reasonably necessary to make a proper evaluation.
Nonconforming Work 5.6.1 Rejection, Removal and Replacement of Nonconforming Work
Cost of remedying Defects Any repair or rectification undertaken in accordance with the provisions of Clause 17.2, including any additional testing, shall be carried out by the Contractor at its own risk and cost, to the extent that such rectification or repair is attributable to: (a) the design of the Project; (b) Plant, Materials or workmanship not being in accordance with this Agreement and the Specifications and Standards; (c) improper maintenance during construction of the Project Highway by the Contractor; and/ or (d) failure by the Contractor to comply with any other obligation under this Agreement.
Product Warranty Seller provides general warranties of fitness and general warranties that the goods are free from defects, for 1 year from acceptance of the goods, except as may otherwise be set forth in the Description/Proposal, or other attached warranty.
Manufacturer’s Warranty The Goods include the manufacturer’s standard limited parts warranty to replace defective parts covered under such warranty exclusive of labor. Labor is warranted by the Elevator Contractor for 90 days following installation. The manufacturer’s parts warranty may require that the Goods be maintained throughout the warranty period by an authorized manufacturer’s representative under a separate maintenance contract. Any warranty is conditioned on written notice to the Elevator Contractor within warranty period and contingent upon receipt of final payment to Elevator Contractor.