Common use of Notice of Completion; Copy of Record Set of Plans Clause in Contracts

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (x) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (y) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Lease, and (z) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Ixia)

AutoNDA by SimpleDocs

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Lease, and (zC) to deliver to Landlord two four (24) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Industrial Real Estate Triple Net Lease (Pacira Pharmaceuticals, Inc.)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may Landxxxx xxx execute and file the same on behalf of Tenant as Tenant’s agent Tenaxx xx Tenaxx’x xgent for such purpose, at Tenant’s sole Tenaxx’x xole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Dexcom Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (x) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (y) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (z) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Ixia)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Initial Improvements, Tenant Reliant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located Santa Xxxxx County in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord Mercury upon such recordation. If Tenant Reliant fails to do so, Landlord Mercury may execute and file the same on behalf of Tenant Reliant as TenantReliant’s agent for such purpose, at TenantReliant’s sole cost and expense. At the conclusion of construction, (i) Tenant Reliant shall cause the Architect Design Professionals and Contractor Contractors (xa) to update the Approved Working Drawings Construction Documents as necessary to reflect all changes made to the Approved Working Drawings Construction Documents during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Leasethis Sub-Sublease, and (zC) to deliver to Landlord Mercury two (2) sets of copies of such record set of drawings and one (including one set 1) additional electronic copy (in an AutoCAD Computer Assisted Drafting and Design System format.dwg format in accordance with AIA layering standards) within ninety (90) days following issuance of a certificate of occupancy for the Subleased Premises, and (ii) Tenant Reliant shall deliver to Landlord Mercury a copy of all warranties, guaranties, and operating manuals and information relating to the improvementsImprovements, equipment, and systems in the Subleased Premises.

Appears in 1 contract

Samples: Sub Sublease (Reliant Technologies Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) ------------------------------------------------- days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion concllusion of construction, (i9i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (y) as necessary to certify reflect all changes made to the best of their knowledge that the "record-set" of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Extreme Networks Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings within thirty (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (9030) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Docusign Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Initial Improvements, Tenant Subtenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located Santa Xxxxx County in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord Sublandlord upon such recordation. If Tenant Subtenant fails to do so, Landlord Sublandlord may execute and file the same on behalf of Tenant Subtenant as TenantSubtenant’s agent for such purpose, at TenantSubtenant’s sole cost and expense. At the conclusion of construction, (i) Tenant Subtenant shall cause the Architect Design Professionals and Contractor Contractors (xA) to update the Approved Working Drawings Construction Documents as necessary to reflect all changes made to the Approved Working Drawings Construction Documents during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Leasethis Sublease, and (zC) to deliver to Landlord Sublandlord two (2) sets of copies of such record set of drawings and one (including one set 1) additional electronic copy (in an AutoCAD Computer Assisted Drafting and Design System format.dwg format in accordance with AIA layering standards) within ninety (90) days following issuance of a certificate of occupancy for the Demised Premises, and (ii) Tenant Subtenant shall deliver to Landlord Sublandlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Demised Premises.

Appears in 1 contract

Samples: Sub Sublease (Reliant Technologies Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Leasethis Amendment , and (zC) to deliver to Landlord two four (24) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the PremisesExpansion Premises , and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Expansion Premises.

Appears in 1 contract

Samples: Office Lease (Catalyst Biosciences, Inc.)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) ------------------------------------------------- days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located appropriate County in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the "record-set" of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Lease Agreement (Advanced Tissue Sciences Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten fifteen (1015) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 8182 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion of constructionconstruction of the Tenant Improvements, (i) Tenant shall cause the Architect and TI Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the "record-set" of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy signed off job card or "finaled" Permits for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises, and (D) copies of signed-off Permits, certificates of occupancy for the Premises, if any, and a stamped set of final approved plans evidencing governmental approval of the completion of the Tenant Improvements.

Appears in 1 contract

Samples: Office Lease (SoFi Technologies, Inc.)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant Landlord shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord Tenant upon such recordation. If Tenant Landlord fails to do so, Landlord Tenant may execute and file the same on behalf of Tenant Landlord as TenantLandlord’s agent for such purpose, at TenantLandlord’s sole cost and expense. At the conclusion of construction, (i) Landlord and Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord and Tenant two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant Landlord shall deliver to Landlord Tenant a copy copy, bound in a binder (with an index), of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Favrille Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 8182 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, and (yB) to certify to the best of their knowledge that the "record-set" of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (z) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.. 4000-0000-0000.5 391174.00001/5-24-21//mem EXHIBIT B -10- XXXXXX XXXXX [Turning Point Therapeutics]

Appears in 1 contract

Samples: Lease (Turning Point Therapeutics, Inc.)

AutoNDA by SimpleDocs

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises., and (iii) Tenant shall deliver to Landlord the original signed permit card, indicating final approval by all applicable departments. WILSHIRE COLONNADE SECTION 5

Appears in 1 contract

Samples: Office Lease

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the "record-set" of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy copy, bound in a binder (with an index), of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the PremisesPremises and the Re-Roofing.

Appears in 1 contract

Samples: Office Lease (Farville Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after substantial completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent Agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (TrueCar, Inc.)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 8182 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect and/or provide Landlord with a set of “as built” drawings reflecting all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord two four (24) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Airbnb, Inc.)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s agent for such purpose, at Tenant’s sole cost and expense. At the conclusion of construction, (i) Tenant shall cause the Architect and Contractor (x) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (y) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the Lease, and (z) to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a EXHIBIT B -9- certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.. SECTION 5

Appears in 1 contract

Samples: Office Lease

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant Landlord shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord Tenant upon such recordation. If Tenant Landlord fails to do so, Landlord Tenant may execute and file the same on behalf of Tenant Landlord as TenantLandlord’s agent for such purpose, at TenantLandlord’s sole cost and expense. At the conclusion of construction, (i) Landlord and Tenant shall cause the Architect and Contractor (xA) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) to certify to the best of their knowledge that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of the this Lease, and (zC) to deliver to Landlord and Tenant two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant Landlord shall deliver to Landlord Tenant a copy copy, bound in a binder (with an index), of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Office Lease (Favrille Inc)

Notice of Completion; Copy of Record Set of Plans. Within ten (10) days after completion of construction of the Tenant Improvements, Tenant shall cause a valid Notice of Completion to be recorded in the office of the Recorder of the county in which the Building is located in accordance with Section 3093 8182 of the Civil Code of the State of California or any successor statute, and shall furnish a copy thereof to Landlord upon such recordation. If Tenant fails to do so, Landlord may execute and file the same on behalf of Tenant as Tenant’s 's agent for such purpose, at Tenant’s 's sole cost and expense. At the conclusion of construction, (i) Tenant shall cause (A) the Architect and Contractor (x) to update the Approved Working Drawings as necessary to reflect all changes made to the Approved Working Drawings during the course of construction, (yB) the Contractor to certify certify, to the best of their knowledge its knowledge, that the “record-set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of this Lease, (C) the Architect to certify, to the best of its knowledge, that the record drawings are true and correct, which certification shall survive the expiration or termination of this Lease, and (zD) the Architect and Contractor to deliver to Landlord two (2) sets of copies of such record set of drawings (including one set in an AutoCAD Computer Assisted Drafting and Design System format) as-built drawings, respectively, within ninety (90) days following issuance of a certificate of occupancy for the Premises, and (ii) Tenant shall deliver to Landlord a copy of all warranties, guaranties, and operating manuals and information relating to the improvements, equipment, and systems in the Premises.

Appears in 1 contract

Samples: Lease (Veeco Instruments Inc)