Notigi Project Description. 5.1.1 Article 5 and Schedules 5.3, 5.4 and 5.5 describe the anticipated Primary Facilities, the existing Principal and Secondary Structures, and the Supporting Infrastructure forming part of the Notigi Project, the existing Notigi Control Structure and related works. The anticipated water regime is described in Article 5.4 and the transmission components related to the Notigi Project are described in Article 5.5.
AutoNDA by SimpleDocs

Related to Notigi Project Description

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • General Project Description 2. Substation location.

  • Contract Description The Description and Location of the Contract and related project(s) are as follows.

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • Project Location & Description The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby described as follows:

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

  • Product Description The lead products covered by this Settlement Agreement is limited to following Amazon Identification Number (ASIN) B0BBMRLNV9, with the description, "Lesnow 63-37 Tin Lead Rosin Core Solder Wire for Electrical Soldering 0.8mm Soldering Wire Electronics Solder Content Solder Flux 1.8% (0.8mm, 50g)," which was offered for sale by the Settling Entity on xxxxxx.xxx, hereinafter the “Product” or “Products.”

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.