Common use of OASIS Posting Clause in Contracts

OASIS Posting. The ISO will maintain on its OASIS a list of all valid Transmission Interconnection Applications. The list will identify, for each Transmission Interconnection Application: (i) the maximum summer and winter megawatt electrical output, if applicable; (ii) the location by county and state; (iii) the station or transmission line or lines where the interconnection will be made; (iv) the projected In-Service Date; (v) the status of the Transmission Interconnection Application, including Queue Position; (vi) the identity of the Transmission Developer; (vii) the availability of any studies related to the Transmission Interconnection Application; (viii) the date of the Transmission Interconnection Application; (ix) the type of the Transmission Project to be constructed; and (x) for Transmission Interconnection Applications that have not resulted in a completed interconnection, an explanation as to why it was not completed. Before holding a Scoping Meeting with an Affiliate of a Connecting Transmission Owner and that Connecting Transmission Owner, the ISO shall post on its OASIS an advance notice of its intent to do so. The ISO shall post to its OASIS site any deviations from the study timelines set forth herein. Transmission Interconnection Study reports shall be posted to the ISO password-protected website subsequent to the meeting between the Transmission Developer, the ISO and the Connecting Transmission Owner(s) to discuss the applicable study results. The ISO shall also post any known deviations in date proposed by the Transmission Project in Section 22.4.3(iv), above.

Appears in 7 contracts

Samples: nyisoviewer.etariff.biz, Service Agreement, Network Operating Agreement

AutoNDA by SimpleDocs

OASIS Posting. 30.3.4.1 The ISO will maintain on its OASIS or a publicly accessible portion of its website a list of all valid Transmission Interconnection ApplicationsRequests. The list will identify, for each Transmission Interconnection ApplicationRequest: (i) the maximum summer and winter megawatt electrical output, if applicable; (ii) the location by county and state; (iii) the station or transmission line or lines where the interconnection will be made; (iv) the projected In-Service Date, Initial Synchronization Date and Commercial Operation Date; (v) the status of the Transmission Interconnection ApplicationRequest, including Queue Position; (vi) the identity of the Transmission Developer; and (vii) the availability of any studies related to the Transmission Interconnection ApplicationRequest; (viii) the date of the Transmission Interconnection ApplicationRequest; (ix) the type of the Transmission Project Large Facility to be constructedconstructed (combined cycle, base load or combustion turbine and fuel type); and (x) for Transmission Interconnection Applications Requests that have not resulted in a completed interconnection, an explanation as to why it was not completed. Before holding a Scoping Meeting with an Affiliate of a Connecting Transmission Owner and that Connecting Transmission Owner, the ISO shall post on its OASIS an advance notice of its intent to do so. The ISO shall post to its OASIS site any deviations from the study timelines set forth herein. Transmission Interconnection Study reports and Optional Interconnection System Reliability Impact Study reports shall be posted to the ISO password-protected website subsequent to the meeting between the Transmission Developer, the The ISO and the Connecting Transmission Owner(s) Owner to discuss the applicable study results. The ISO shall also post any known deviations in date proposed by the Transmission Project Large Facility in Section 22.4.3(iv30.3.4(iv), above.

Appears in 2 contracts

Samples: Standard Large Generator Interconnection Agreement, Service Agreement

AutoNDA by SimpleDocs