Observation and Formative Feedback Process Sample Clauses

Observation and Formative Feedback Process a. In at least one announced and other unannounced visits, evaluators observe teachers in performance of their work assignments and provide formative feedback in conference and written forms.
AutoNDA by SimpleDocs

Related to Observation and Formative Feedback Process

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • ACCESS TO OPERATIONS SUPPORT SYSTEMS 2.1 BellSouth shall provide Max-Tel access to operations support systems (“OSS”) functions for pre-ordering, ordering and provisioning, maintenance and repair, and billing. BellSouth shall provide access to the OSS through manual and/or electronic interfaces as described in this Attachment. It is the sole responsibility of Max-Tel to obtain the technical capability to access and utilize BellSouth’s OSS interfaces. Specifications for Max-Tel ’s access and use of BellSouth’s electronic Version R4Q01: 12/01/01 interfaces are set forth at xxx.xxxxxxxxxxxxxxx.xxxxxxxxx.xxx and are incorporated herein by reference.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Exceptional Access to Thick Registration Data In case of a registrar failure, deaccreditation, court order, etc. that prompts the temporary or definitive transfer of its domain names to another registrar, at the request of ICANN, Registry Operator will provide ICANN with up-­‐to-­‐date data for the domain names of the losing registrar. The data will be provided in the format specified in Specification 2 for Data Escrow. The file will only contain data related to the domain names of the losing registrar. Registry Operator will provide the data as soon as commercially practicable, but in no event later than five (5) calendar days following ICANN’s request. Unless otherwise agreed by Registry Operator and ICANN, the file will be made available for download by ICANN in the same manner as the data specified in Section 3.1 of this Specification.

  • PROJECT MILESTONES, REPORTING AND PAYMENTS 15. The milestones for the projects, their relationship to the outputs, expected completion dates, relevant reporting dates and expected payments to be made are set out in bilateral schedules to this Agreement. The Commonwealth will make payments subject to the performance reports demonstrating the relevant milestone has been met.

  • Bulk Registration Data Access to Icann Periodic Access to Thin Registration Data. In order to verify and ensure the operational stability of Registry Services as well as to facilitate compliance checks on accredited registrars, Registry Operator will provide ICANN on a weekly basis (the day to be designated by ICANN) with up-to-date Registration Data as specified below. Data will include data committed as of 00:00:00 UTC on the day previous to the one designated for retrieval by ICANN.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.