Oil & Gas Production and Extraction Sample Clauses

Oil & Gas Production and Extraction. (a) It shall be unlawful and a violation of this article for any person, acting either for himself or as an agent, employee, independent contractor or servant of any other person, to explore for oil and gas, or to commence operations, or to operate or service any well, or to drill, or to re- enter any well including to workover, re-complete, plug back, deepen, or activate any well or to re-enter any well which has been plugged and abandoned, or to engage in related storage of oil, natural gas, and other hydrocarbons within the corporate limits of the city without a specific use permit having first been issued by the authority of the council in accordance with the terms of this chapter. No specific use permit shall be authorized for more than one (1) well.
AutoNDA by SimpleDocs

Related to Oil & Gas Production and Extraction

  • Production Lessee shall, subject to applicable laws, regulations and orders, operate and produce all xxxxx upon the leased land so long as the same are capable of producing in paying quantities, and shall operate the same so as to produce at a rate commensurate with the rate of production of xxxxx on adjoining lands within the same field and within the limits of good engineering practice, except for such times as there exist neither market nor storage therefore, and except for such limitations on, or suspensions of, production as may be approved in writing by Lessor. Lessee shall be responsible for adequate site security on all producing properties.

  • Minerals All minerals, crops, timber, trees, shrubs, flowers and landscaping features now or hereafter located on, under or above Land;

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Guaranteed Energy Production (A) Throughout the Delivery Term, Seller shall be required to provide to Buyer an amount of Delivered Energy plus Deemed Delivered Energy, if any, no less than the Guaranteed Energy Production over two (2) consecutive Contract Years during the Delivery Term (“Performance Measurement Period”). “

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Solid Waste The Licensee shall have to make arrangements for disposal of solid waste, which shall be got removed from the premises on a daily basis to ensure perfect cleanliness as per Corporation of Chennai Norms. The Licensee shall have to make arrangements for the solid waste to be separated into glass, plastic and food waste and for the food waste to be treated in a shredder to be converted into a paste. The waste shall need to be expelled into a common dump or waste area provided/ indicated by CMRL. If solid waste is found disposed of on CMRL land or premises a penalty/fine of Rs.2000/- shall be imposed by CMRL for each occasion.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Air Transportation In accordance with the standard provision entitled International Air Transportation, any international travel requires prior written approval from the FHI360 contracts administrator.

Time is Money Join Law Insider Premium to draft better contracts faster.