Oil Reservoir Sample Clauses

Oil Reservoir. The oil reservoir has a nominal capacity of 2500 gallons (9463 liters) and is mounted within the accessory base. It is equipped with lubrication oil level switches to indicate full, empty, high level alarm, low level alarm, and low level trip. In addition the following are mounted on the reservoir: Oil tank thermocouples Oil heaters Oil filling filter Oil reservoir drains Inlet System
AutoNDA by SimpleDocs

Related to Oil Reservoir

  • Drinking Water Adequate arrangement shall be made for the supply of drinking water. If practicable filtered and chlorinated supplies shall be arranged when supplies are from intermittent sources overhead storage tank shall be provided with capacity of five liters a person per day. Where the supply is to be made from a well, it shall conform to the sanitary standard laid down in the report of the Rural Sanitation Committee. The well should be at least 30 meters away from any latrine or other source of population. If possible, hand pump should be installed for drinking water from well. The well should be effectively disinfected once every month and the quality of water should be got tested at the public Health Institution between each work of disinfecting.

  • Environmental Management (a) The Operator must, prior to the commencement of any Train Services (including any new or varied Train Services):

  • MINES The Contractor represents and warrants that neither it, its parent entities (if any), nor any of the Contractor’s subsidiaries or affiliated entities (if any) is engaged in the sale or manufacture of anti-personnel mines or components utilized in the manufacture of anti-personnel mines.

  • Waste Management 4.1 Has your company been issued an EPA Hazardous Waste Generator I.D. Number? Existing Tenants should describe any additional identification numbers issued since the previous certificate. Yes [ ] No [ ]

  • Nuclear Hazard This Exclusion 7. pertains to Nuclear Hazard to the extent set forth in M. Nuclear Hazard Clause under Section I – Conditions.

  • FLOODPLAIN MANAGEMENT AND WETLAND PROTECTION Executive Order 11988, Floodplain Management, May 24, 1977 (42 FR 26951), 3 C.F.R., 1977 Comp., p. 117, as interpreted in HUD regulations at 24 C.F.R. Part 55, particularly Section 2(a) of the Order (For an explanation of the relationship between the decision- making process in 24 C.F.R. Part 55 and this part, see § 55.10.); and Executive Order 11990, Protection of Wetlands, May 24, 1977 (42 FR 26961), 3 C.F.R., 1977 Comp., p. 121 particularly Sections 2 and 5. COASTAL ZONE MANAGEMENT The Coastal Zone Management Act of 1972 (16 U.S.C. § 1451, et seq.), as amended, particularly sections 307(c) and (d) (16 U.S.C. § 1456(c) and (d)).

  • Natural Resources Protecting America’s great outdoors and natural resources.

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $0 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $2,675,745 - OWDA $0 - CDBG $0 - Other $0 SUBTOTAL $2,675,745 v) OPWC Funds: - Loan $299,000 SUBTOTAL $299,000 TOTAL FINANCIAL RESOURCES $2,974,745

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

Time is Money Join Law Insider Premium to draft better contracts faster.