Opened Walls/Ceilings Sample Clauses

Opened Walls/Ceilings. If it is necessary to open walls or ceilings to make repairs, We will close the opening, provided the walls and/or ceilings were not damaged by water prior to the Authorized Repair Technician beginning its Services or repairs, and return to a rough finish condition, subject to the monetary limits in this Service Agreement. We are not responsible for the restoration of wall coverings, floor coverings, plaster, cabinets, countertops, tiling, paint, or other surfaces. Similarly, We are not responsible for the repair ofany cosmetic defects.
AutoNDA by SimpleDocs
Opened Walls/Ceilings. At times it is necessary to open walls or ceilings to make repairs, We are not responsible for the repair or replacement of any drywall, restoration of any wall coverings, floor coverings, plaster, cabinets, countertops, tiling, paint or the like.

Related to Opened Walls/Ceilings

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Building Access i. Access to Secured buildings: Contractor will work through the GIT Contract administrator for access to the building.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Doors Exterior doors may not be propped open for safety and security reasons. Students may be referred to the student conduct system if found propping these doors. Doors marked as emergency exits may only be used for emergency purposes other than during University-sanctioned move-in days.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Retaining Walls Prepare preliminary retaining concepts to be shown on schematics, typical sections, and cross sections. • Determine if any additional walls are required and verify the need for and length of the retaining wall as shown on the ultimate schematic. • Compute and tabulate retaining wall quantities for preliminary design milestone plans submittal.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.