Operation of System Metering and Other Monitoring Equipment Sample Clauses

Operation of System Metering and Other Monitoring Equipment. If required by SoCalGas pursuant to the M&V Plan, Customer agrees to install and operate a gas meter(s) or any other monitoring equipment on the System at Customer's facility for measurement and validation purposes for ten (10) calendar years following the date that SoCalGas verifies the complete installation of the System. Data generated by the meter or monitoring equipment will be provided to SoCalGas upon request or pursuant to a schedule agreed to by the parties.
AutoNDA by SimpleDocs

Related to Operation of System Metering and Other Monitoring Equipment

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • System Monitoring to ensure safe and continuous operation, the Customer must monitor key services and resource use as recommended by Deswik, and provide Deswik with details of monitoring and any relevant alerts as needed. Services to be monitors include, without limitation, disk space, CPU usage, memory usage, database connectivity, and network utilization.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

  • Management and Control Systems Grantee will:

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract.

  • MAINTENANCE AND REPAIR; RULES Tenant will, at its sole expense, keep and maintain the Premises and appurtenances in good and sanitary condition and repair during the term of this Agreement and any renewal thereof. Without limiting the generality of the foregoing, Tenant shall:

Time is Money Join Law Insider Premium to draft better contracts faster.