Paving Lift Requirements and Time Limitations Sample Clauses

Paving Lift Requirements and Time Limitations. For paving lifts of 2.0” or less, bring all newly resurfaced lanes to the same station and elevation within 72 hours. If not brought up to the same station and elevation within 72 hours, the Contractor shall place portable “UNEVEN PAVEMENT” signs in advance of the uneven pavement and spaced every ½ mile along the section of uneven pavement. Once mitigated, all portable “UNEVEN PAVEMENT” signs shall be removed. No additional compensation will be made for these signs or any other type of portable warning signs as these are included in the “Temporary Traffic Control” contract pay item. For paving lifts greater than 2”, bring all newly resurfaced lanes to the same station and elevation by the end of each work day unless the Contractor utilizes the notched wedge paving methods as described below. 1. During paving operations, any paving lift greater than 2” for asphalt surface course mixes shall be mitigated by having an approved wedge apparatus on the paver that shapes the edge 1” vertically and the remaining at a maximum slope steepness of 2:1. For intermediate and base course mixes, use an approved wedge device that shapes the edge with a maximum slope steepness of 2:1. The maximum paving lift allowed to use this method is 3”. 2. At the end of the work day, the Contractor shall place portable “UNEVEN PAVEMENT” signs in advance of the uneven pavement and spaced every ½ mile along the section of uneven pavement. Once mitigated, all portable “UNEVEN PAVEMENT” signs shall be removed. No additional compensation will be made for these signs or any other type of portable warning signs as these are included in the “Temporary Traffic Control” contract pay item. 3. In the next day’s paving operation and not to exceed 72 hours, the Contractor shall bring up the adjacent lane to the same station and elevation before any further paving takes placed on the project.
AutoNDA by SimpleDocs
Paving Lift Requirements and Time Limitations. Failure to comply with the following requirements will result in a suspension of all other operations until all lanes of traffic are brought to the same station and elevation:
Paving Lift Requirements and Time Limitations. For paving lifts of 2.0 inches or less, bring all newly resurfaced lanes to the same station and elevation within 72 hours. If not brought up to the same station and elevation within 72 hours, the Contractor shall place portable “UNEVEN PAVEMENT” signs in advance of the uneven pavement and spaced every 1/2 mile along the section of uneven pavement. Once mitigated, all portable “UNEVEN PAVEMENT” signs shall be removed. No additional compensation will be made for these signs or any other type of portable warning signs as these are included in the “Temporary Traffic Control” contract pay item. For paving lifts greater than 2 inches, bring all newly resurfaced lanes to the same station and elevation by the end of each work day unless the Contractor utilizes the notched wedge paving methods as described below.

Related to Paving Lift Requirements and Time Limitations

  • Compliance with Xxxxx-Xxxxx and Related Act requirements All rulings and interpretations of the Xxxxx-Xxxxx and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.

  • Compliance with Xxxxxxxx Act requirements The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.

  • Compliance with Federal and State Work Authorization and Immigration Laws The Contractor and all subcontractors, suppliers and consultants must comply with all federal and state work authorization and immigration laws, and must certify compliance using the form set forth in Section 7 (“Georgia Security and Immigration Compliance Act Affidavits”). The required certificates must be filed with the Owner and copied maintained by the Contractor as of the beginning date of this contract and each subcontract, supplier contract, or consultant contract, and upon final payment to the subcontractor or consultant. State officials, including officials of the Georgia Department of Audits and Accounts, officials of the Owner, retain the right to inspect and audit the Project Site and employment records of the Contractor, subcontractors and consultants without notice during normal working hours until Final Completion, and as otherwise specified by law and by Rules and Regulations of the Georgia Department of Audits and Accounts.

  • Geographic Area and Sector Specific Allowances, Conditions and Exceptions The following allowances and conditions shall apply where relevant. Where the Employer does work which falls under the following headings, the Employer agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • DRUG-FREE WORKPLACE REQUIREMENTS Contractor will comply with the requirements of the Drug-Free Workplace Act of 1990 and will provide a drug-free workplace by taking the following actions: a. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations. b. Establish a Drug-Free Awareness Program to inform employees about: 1) the dangers of drug abuse in the workplace; 2) the person's or organization's policy of maintaining a drug-free workplace; 3) any available counseling, rehabilitation and employee assistance programs; and, 4) penalties that may be imposed upon employees for drug abuse violations. c. Every employee who works on the proposed Agreement will: 1) receive a copy of the company's drug-free workplace policy statement; and, 2) agree to abide by the terms of the company's statement as a condition of employment on the Agreement. Failure to comply with these requirements may result in suspension of payments under the Agreement or termination of the Agreement or both and Contractor may be ineligible for award of any future State agreements if the department determines that any of the following has occurred: the Contractor has made false certification, or violated the certification by failing to carry out the requirements as noted above. (Gov. Code §8350 et seq.)

  • CERTIFICATION REGARDING DRUG-FREE WORKPLACE REQUIREMENTS 1. The Contractor certifies that it will provide a drug-free workplace by: a. Publishing a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violation of such prohibition;

  • Compliance with Timing Requirements of Regulations In the event the Partnership is "liquidated" within the meaning of Regulations Section 1.704-1(b)(2)(ii)(g), distributions shall be made pursuant to this Article 13 to the General Partner and Limited Partners who have positive Capital Accounts in compliance with Regulations Section 1.704-1(b)(2)(ii)(b)(2). If any Partner has a deficit balance in his or her Capital Account (after giving effect to all contributions, distributions and allocations for the taxable years, including the year during which such liquidation occurs), such Partner shall have no obligation to make any contribution to the capital of the Partnership with respect to such deficit, and such deficit shall not be considered a debt owed to the Partnership or to any other Person for any purpose whatsoever, except to the extent otherwise agreed to by such Partner and the General Partner. In the discretion of the Liquidator or the General Partner, a pro rata portion of the distributions that would otherwise be made to the General Partner and Limited Partners pursuant to this Article 13 may be: A. distributed to a trust established for the benefit of the General Partner and Limited Partners for the purposes of liquidating Partnership assets, collecting amounts owed to the Partnership, and paying any contingent or unforeseen liabilities or obligations of the Partnership or of the General Partner arising out of or in connection with the Partnership. The assets of any such trust shall be distributed to the General Partner and Limited Partners from time to time, in the reasonable discretion of the Liquidator or the General Partner, in the same proportions and the amount distributed to such trust by the Partnership would otherwise have been distributed to the General Partner and Limited Partners pursuant to this Agreement; or B. withheld to establish any reserves deemed necessary or appropriate for any contingent or unforeseen liabilities or obligations of the Partnership; and to reflect the unrealized portion of any installment obligations owed to the Partnership; provided that, such withheld amounts shall be distributed to the General Partner and Limited Partners as soon as practicable.

  • Lessee's Compliance with Applicable Requirements Except as otherwise provided in this Lease, Lessee shall, at Lessee's sole expense, fully, diligently and in a timely manner, materially comply with all Applicable Requirements, the requirements of any applicable fire insurance underwriter or rating bureau, and the recommendations of Lessor's engineers and/or consultants which relate in any manner to the Premises, without regard to whether said requirements are now in effect or become effective after the Start Date. Lessee shall, within ten (10) days after receipt of Lessor's written request, provide Lessor with copies of all permits and other documents, and other information evidencing Lessee's compliance with any Applicable Requirements specified by Lessor, and shall immediately upon receipt, notify Lessor in writing (with copies of any documents involved) of any threatened or actual claim, notice, citation, warning, complaint or report pertaining to or involving the failure of Lessee or the Premises to comply with any Applicable Requirements.

  • Civil Rights Requirements The Recipient agrees that it must comply with applicable federal civil rights laws, regulations, and requirements, and follow applicable federal guidance, except as the Federal Government determines otherwise in writing. Therefore, unless a Recipient or a federal program, including the Indian Tribe Recipient or the Tribal Transit Program, is specifically exempted from a civil rights statute, FTA requires compliance with each civil rights statute, including compliance with equity in service requirements.

  • CONTRACT WORK HOURS AND SAFETY STANDARDS As per the Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708), where applicable, all Customer Purchase Orders in excess of ,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!