Per Gallon Factor: 0 Sample Clauses

Per Gallon Factor: 0. 28 Using a Potential for Harm score of 6 and a major Deviation from Requirement, Table 2 of the Enforcement Policy prescribes a factor of 0.28 as the Per Gallon Factor for the discharge.
AutoNDA by SimpleDocs

Related to Per Gallon Factor: 0

  • Non pre-priced Adjustment Factor To be applied to Work deemed not to be included in the CTC but within the general scope of the work:

  • Evaluation Factors The walkthrough(s), observation(s), and other components required by Ohio Rev. Code to be used in the teacher evaluation procedure

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Multiplier For Work assigned under this Agreement, a maximum multiplier of 2.9 for home office and 2.4 for field office shall apply to Consultant’s hourly Wage Rates in calculating compensation payable by the City. Said multiplier is intended to cover the Consultant employee benefits and the Consultant’s profit and overhead, including, without limitation, office rent, local telephone and utility charges, office and drafting supplies, depreciation of equipment, professional dues, subscriptions, stenographic, administrative and clerical support, other employee time or travel and subsistence not directly related to a project.

  • First Year Wage Adjustment Effective July 1, 2017, all salary ranges and rates shall be increased by two percent (2.0%), rounded to the nearest cent. The compensation grids for classes covered by this Agreement are contained in Appendix E-1. Employees shall convert to the new compensation grid as provided in Section 2.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • ADJUSTMENT FACTORS The Contractor will perform any or all Tasks in the Construction Task Catalog for the Unit Price appearing therein multiplied by the following Adjustment Factors. See the General Terms and Conditions for additional information.

  • ECONOMIC PRICE ADJUSTMENT is the adjustment to the Aircraft Basic Price (Base Airframe, Engine and Special Features) as calculated pursuant to Exhibit D.

  • Power Factor Requirement Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: The Generation Interconnection Customer shall design its non-synchronous Customer Facility with the ability to maintain a power factor of at least 0.95 leading to 0.95 lagging measured at the high-side of the facility substation transformers.

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

Time is Money Join Law Insider Premium to draft better contracts faster.