Phasor Measurement Unit (PMU Sample Clauses

Phasor Measurement Unit (PMU. In order to avoid or prosecute the abuse of given authorisation , the latter should only give minimal rights (4.1.13) and be subject to stringent logging (4.1.14). This also applies to prevent the abuse of information leakages, furthermore, for leakage prevention, data on, from or to the device should be encrypted (4.1.12.1, 4.1.12.2) or, for communications, segregated (4.1.1). Apart from that, to prevent tampering on the device or its communication lines, be it accidental or deliberate (sabotage), physical access must be restricted to authorised personnel (4.1.17). In order to reduce the attack surface, the device (4.1.8) and its main application (4.1.9) should also be hardened. Ideally, the device exhibits only the network interface to its gateway and being otherwise totally severed from the network. If that is not possible, access has to be restricted by firewalls (4.1.2). To have a proper replacement in case of a device failure (through technical errors, disasters, sabotage, etc.), the device should have redundancy (4.1.16.1). This also applies for its power supply (4.1.16.2). Due to uncertain support, the device should experience legacy equipment treatment (4.1.19). To avoid rouge devices to get or set data in the device, proper crypto-based authentication should be in place (4.1.12.4). Table 18 gives a structured overview of the requirements for the PMU. Table 18: PMU Requirements Requirement Building block reference Communications Segregation* 4.1.1 Device Hardening 4.1.8 Application Hardening 4.1.9 Storage Encryption 4.1.12.1 Communications Encryption* 4.1.12.2 Integrity Checking 4.1.12.3 Minimal Rights 4.1.13 Logging 4.1.14 Device/Hardware Redundancy 4.1.16.1 Power Redundancy 4.1.16.2 Physical Security 4.1.17 Legacy Equipment Treatment 4.1.19
AutoNDA by SimpleDocs

Related to Phasor Measurement Unit (PMU

  • Performance Measurement Satisfactory performance of this Contract will be measured by:

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Units of Measurement In all correspondence, in all technical schedules, on all drawings and for all instrument scales, SI units of measurement are to be employed. On drawings where IEC or other units have been used it will be in order if the equivalent SI measurement is suitably marked in addition.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • PERFORMANCE MEASUREMENTS Upon a particular Commission’s issuance of an Order pertaining to Performance Measurements in a proceeding expressly applicable to all CLECs generally, BellSouth shall implement in that state such Performance Measurements as of the date specified by the Commission. Performance Measurements that have been Ordered in a particular state can currently be accessed via the internet at xxxx://xxxx.xxxxxxxxx.xxx. The following Service Quality Measurements (SQM) plan as it presently exists and as it may be modified in the future, is being included as the performance measurements currently in place for the state of Tennessee. At such time that the TRA issues a subsequent Order pertaining to Performance Measurements, such Performance Measurements shall supersede the SQM contained in the Agreement. BellSouth Service Quality Measurement Plan‌ (SQM) Tennessee Performance Metrics Measurement Descriptions Version 2.00 Issue Date: July 1, 2003 Introduction

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Long Term Cost Evaluation Criterion # 4 READ CAREFULLY and see in the RFP document under "Proposal Scoring and Evaluation". Points will be assigned to this criterion based on your answer to this Attribute. Points are awarded if you agree not i ncrease your catalog prices (as defined herein) more than X% annually over the previous year for years two and thr ee and potentially year four, unless an exigent circumstance exists in the marketplace and the excess price increase which exceeds X% annually is supported by documentation provided by you and your suppliers and shared with TIP S, if requested. If you agree NOT to increase prices more than 5%, except when justified by supporting documentati on, you are awarded 10 points; if 6% to 14%, except when justified by supporting documentation, you receive 1 to 9 points incrementally. Price increases 14% or greater, except when justified by supporting documentation, receive 0 points. increases will be 5% or less annually per question Required Confidentiality Claim Form Required Confidentiality Claim Form This completed form is required by TIPS. By submitting a response to this solicitation you agree to download from th e “Attachments” section, complete according to the instructions on the form, then uploading the completed form, wit h any confidential attachments, if applicable, to the “Response Attachments” section titled “Confidentiality Form” in order to provide to TIPS the completed form titled, “CONFIDENTIALITY CLAIM FORM”. By completing this process, you provide us with the information we require to comply with the open record laws of the State of Texas as they ma y apply to your proposal submission. If you do not provide the form with your proposal, an award will not be made if your proposal is qualified for an award, until TIPS has an accurate, completed form from you. Read the form carefully before completing and if you have any questions, email Xxxx Xxxxxx at TIPS at xxxx.xxxxxx@t xxx-xxx.xxx

  • Method of Measurement The harmonics emission on AC power lines generated by the vehicle representative of its type shall be measured using the method described in Annex 11. The method of measurement shall be defined by the vehicle manufacturer in accordance with the Technical Service.

Time is Money Join Law Insider Premium to draft better contracts faster.