PLACEMENT OF REINFORCING STEEL Sample Clauses

PLACEMENT OF REINFORCING STEEL. A. Contractor must place reinforcement as shown on the Contract Drawings, or on approved Shop Drawings, and in accordance with the applicable requirements of ACI 301, ACI 318 and the CRSI Manual. Contractor must install reinforcement accurately and secure against movement.
AutoNDA by SimpleDocs

Related to PLACEMENT OF REINFORCING STEEL

  • Placement of RDDS probes Probes for measuring RDDS parameters shall be placed inside the networks with the most users across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • Placement of EPP probes Probes for measuring EPP parameters shall be placed inside or close to Registrars points of access to the Internet across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • Musculoskeletal Injury Prevention and Control (a) The Hospital in consultation with the Joint Health and Safety Committee (JHSC) shall develop, establish and put into effect, musculoskeletal prevention and control measures, procedures, practices and training for the health and safety of employees.

  • Placement of DNS probes Probes for measuring DNS parameters shall be placed as near as possible to the DNS resolvers on the networks with the most users across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

Time is Money Join Law Insider Premium to draft better contracts faster.