Planting Methods Sample Clauses

Planting Methods. ‌ Planting shall occur after several winter rain events have moistened the sand to a depth of at least six inches and shorter photoperiods and cooler daily temperatures reduce the stress on new plants (typically November – February). When feasible, planting will be scheduled during periods of cool weather when precipitation is forecasted. Installing container stock during the winter when the sand is moist maximizes the odds of success, especially in the absence of an irrigation system. Planting in the early fall prior to the onset of winter rainfall should be avoided. During this time of year, daily temperatures are warmer, the photoperiod is longer, and sand is dry to a greater depth due to the absence of rainfall in a Mediterranean climate. Planting shall occur in areas where invasive non-native plant removal has been completed. Planting is not necessary where existing healthy dune vegetation is already present. Following the determination of plant layout, plants will be installed by hand digging a planting pit in the sand, carefully extracting the plant from the container with minimal root disturbance, placing the plant so it is sitting vertically in the hole and backfilling and compressing the sand around the plant by hand. Care should be exercised to not break off or bend the root ball during planting.
AutoNDA by SimpleDocs
Planting Methods 

Related to Planting Methods

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Design Criteria and Standards All PROJECTS/SERVICES shall be performed in accordance with instructions, criteria and standards set forth by the DIRECTOR.

Time is Money Join Law Insider Premium to draft better contracts faster.