Post-Synchronization Tests. Upon the issuance by the Independent Engineer of the Certificate of Readiness for Synchronization with respect to a particular Unit, the Concessionaire shall conduct the Post-Synchronization Tests described in Schedule 7, on such Unit. Once the Concessionaire is satisfied that the Unit has successfully passed the Post-Synchronization Tests and is capable of continued reliable operation, the Concessionaire shall request that the Independent Engineer to issue the Certificate of Readiness for Commissioning for such Unit. Upon issuance of the Certificate of Readiness for Commissioning for each Unit of particular Hydropower Plant, Independent Engineer shall issue the Certificate of Readiness for Commissioning for such Hydropower Plant. Upon the issuance of Certificate of Readiness for Commissioning for each Hydropower Plant, Independent Engineer shall issue Certificate of Readiness for Commissioning for Xxxxxx HPPs and Xxxxxx Transmission Line.
AutoNDA by SimpleDocs
Post-Synchronization Tests. Test Acceptance Value Heat run test Pass Load tests pass Segregated losses pass Unit load rejection and over-speed tests pass Emergency stop test pass Quick stop test pass Tests of the automatic excitation equipment pass Short circuit ratio pass Generator reactance and time constant measurement pass Net generating capacity The Contract Capacity of each Unit, as specified in Schedule 6 of the Concession Agreement Net reactive capacity The Contract Capacity of each Unit, as specified in Schedule 6 of the Concession Agreement Load ramping rate The Contract Capacity of each Unit, as specified in Schedule 6 of the Concession Agreement

Related to Post-Synchronization Tests

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Health Tests At the time of employment, the Employer shall provide a Tuberculin skin test at no cost to the nurse. In the event of a positive reaction to this test, the Employer will provide a chest x-ray at no cost. Upon request, a routine blood examination and urinalysis will be provided at no cost to the nurse once each year.

Time is Money Join Law Insider Premium to draft better contracts faster.