Power Polarity Sample Clauses

Power Polarity. Meters shall be full quadrant (four quadrant) type for measuring power flow in any direction without variation of accuracy.
AutoNDA by SimpleDocs

Related to Power Polarity

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Transponders a. You agree to obtain a sticker Transponder for each vehicle registered to your Account. b. OCTA agrees to provide you one sticker Transponder for each vehicle registered to your account at no charge. c. To obtain carpool discounts you must purchase a FasTrak Flex Transponder. d. You agree to set the self-declaration switch on your FasTrak Flex Transponder in accordance with applicable laws, regulations, ordinances and policies prior to traveling on the 405 Express Lanes. e. If your FasTrak Flex Transponder fails to operate for reasons other than abuse or improper use, return it to us and we’ll replace it at no charge within five years of purchase of the FasTrak Flex Transponder. All other FasTrak Flex Transponder replacements or additional Transponder(s) will result in $15 for each FasTrak Flex Transponder. You agree to mount your Transponder according to the instructions provided to you and to ensure that your Transponder is in good working order. f. Sticker Transponders will be replaced at no additional charge. You acknowledge that sticker Transponders can only be used on one vehicle and that removing the Transponder will damage it and require you to obtain a new Transponder. g. If you drive on the 405 Express Lanes without a properly mounted Transponder in good working order or your Transponder is not read for any other reason, we may use an image of your license plate number to bill your Account. You agree to pay an administrative fee of $2 per image-based transaction in addition to the toll. If the license plate number is not active on your Account at the time of travel, or if your Account is not in good standing, you may receive a toll evasion violation or a citation by the CHP. You agree that we may charge you an additional processing fee. h. If you sell a vehicle or if your Transponder is lost or stolen, notify us immediately and you will not be liable for any unauthorized use of your Transponder that occurs after such notification.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Power Tools All time spent by Employees travelling to and from distant work will be paid as if worked during the time the travel is taken.

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Procurement of Small Works Works estimated to cost $250,000 equivalent or less per contract, up to an aggregate amount not to exceed $800,000 equivalent, may be procured under lump-sum, fixed-price contracts awarded on the basis of quotations obtained from three (3) qualified domestic contractors in response to a written invitation. The invitation shall include a detailed description of the works, including basic specifications, the required completion date, a basic form of agreement acceptable to the Bank, and relevant drawings, where applicable. The award shall be made to the contractor who offers the lowest price quotation for the required work, and who has the experience and resources to complete the contract successfully. Part D: Review by the Bank of Procurement Decisions

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the end-user’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the end-user and the cross-box.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!