Power Supply and Distribution System a. Main Power The electrical supply to the existing building is obtained from State Electricity Board at 41 5V. Currently, about 50 kVA is being consumed by the Theatre towards lighting and other loads with the incoming supply from Electricity Board is terminated at the main distribution board (referred as “Theatre-i”) housed in the DG room. b. Stand-by Power i. The existing DG of 110 1CVA rating is also connected to the main distribution board. Another distribution board (referred as “Thcatre-2”) with a facility to connect a mobile DG set of similar capacity is available. Provision is made to connect both these distribution boards. The sub distribution board (DB) at the stage is provided with a changeover facility to receive power from either of the main distribution boards. ii. The renovated Tagore Cultural Centre should have distribution system should have adequate numbers of feeders for lighting, audio, fire alarm, UPS system, etc. 26
AutoNDA by SimpleDocs

Related to Power Supply and Distribution System a

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • OVATIONS FOOD SERVICES, L.P. dba SPECTRA All food and beverage service must be discussed with and approved by Spectra, the OCFEC Master Concessionaire. FORM F-31 AGREEMENT NO. R-026-18 DATE May 16, 2018 REVIEWED APPROVED RENTAL AGREEMENT FAIRTIME INTERIM XX THIS AGREEMENT by and between the 32nd District Agricultural Association dba OC Fair & Event Center, hereinafter called the Association, and B & L Productions, Inc. hereinafter, called the Rentor

  • Network Upgrades and Distribution Upgrades The Participating TO shall design, procure, construct, install, and own the Network Upgrades and Distribution Upgrades described in Appendix A. The Interconnection Customer shall be responsible for all costs related to Distribution Upgrades. Unless the Participating TO elects to fund the capital for the Distribution Upgrades and Network Upgrades, they shall be solely funded by the Interconnection Customer.

  • Distribution Services The Distributor shall sell and repurchase Shares as set forth below, subject to the registration requirements of the 1933 Act and the rules and regulations thereunder, and the laws governing the sale of securities in the various states ("Blue Sky Laws"):

  • Air Transport Services 1. For the purposes of this Article:

  • Archival Back-Up and Disaster Recovery Licensee may use and copy the Product and related Documentation in connection with: i) reproducing a reasonable number of copies of the Product for archival backup and disaster recovery procedures in the event of destruction or corruption of the Product or disasters or emergencies which require Licensee to restore backup(s) or to initiate disaster recovery procedures for its platform or operating systems; ii) reproducing a reasonable number of copies of the Product and related Documentation for cold site storage. “Cold Site” storage shall be defined as a restorable back-up copy of the Product not to be installed until and after the declaration by the Licensee of a disaster; iii) reproducing a back-up copy of the Product to run for a reasonable period of time in conjunction with a documented consolidation or transfer otherwise allowed herein. “Disaster Recovery” shall be defined as the installation and storage of Product in ready-to-execute, back-up computer systems prior to disaster or breakdown which is not used for active production or development.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

Time is Money Join Law Insider Premium to draft better contracts faster.