Producer Facilities. (a) Producer, at its own expense, shall construct, equip, maintain and operate all facilities necessary to deliver Dedicated Saltwater to Gatherer at the Receipt Points. Producer shall install and maintain sufficient pressure regulating equipment upstream of the Receipt Points on the Gathering System in order to keep the pressure of the Saltwater delivered to Gatherer at such Receipt Points from exceeding the maximum allowable operating pressure of the Gathering System at the applicable Receipt Point, as determined by Gatherer in its sole discretion. Such equipment shall include low pressure separation facilities and atmospheric tankage upstream of the Receipt Points. (b) Producer shall have the right to install facilities and flow volumes attributable to Producer’s interests in operated and non-operated xxxxx outside, but on DSUs that are contiguous with, the Dedicated Acreage, allowing such xxxxx to flow into existing CDPs or to new CDPs mutually agreed between Producer and Gatherer where Gatherer shall provide a meter and tap at Gatherer’s sole cost and expense. Producer shall provide a list of xxxxx from outside, but on DSUs that are contiguous with, the Dedicated Acreage that will be connected to existing CDPs or to new CDPs in accordance with this Section 7.2(b).
Appears in 8 contracts
Samples: Produced and Flowback Water Gathering and Disposal Agreement (Oasis Midstream Partners LP), Produced and Flowback Water Gathering and Disposal Agreement (Oasis Midstream Partners LP), Produced and Flowback Water Gathering and Disposal Agreement
Producer Facilities. (a) Producer, at its own expense, shall construct, equip, maintain and operate all facilities necessary to deliver Dedicated Saltwater Crude Oil to Gatherer at the Receipt Points. Producer shall install and maintain sufficient pressure regulating equipment upstream of the Receipt Points on the Gathering System in order to keep the pressure of the Saltwater Crude Oil delivered to Gatherer at such Receipt Points from exceeding the maximum allowable operating pressure of the Gathering System at the applicable Receipt Point, as determined by Gatherer in its sole discretiondiscretion and stated in the Gathering System Plan. Such equipment shall include low pressure separation facilities and atmospheric tankage upstream of the Receipt Points.
(b) Producer shall have the right to install facilities and flow volumes attributable to Producer’s interests in operated and non-operated xxxxx outside, but on DSUs that are contiguous with, the Dedicated Acreage, allowing such xxxxx to flow into existing CDPs or to new CDPs mutually agreed between Producer among Producer, Shipper and Gatherer where Gatherer shall provide a meter and tap at Gatherer’s sole cost and expense. Producer shall provide a list of xxxxx from outside, but on DSUs that are contiguous with, the Dedicated Acreage that will be connected to existing CDPs or to new CDPs in accordance with this Section 7.2(b7.3(b).
Appears in 5 contracts
Samples: Crude Oil Gathering and Storage Agreement (Oasis Midstream Partners LP), Crude Oil Gathering and Storage Agreement (Oasis Midstream Partners LP), Crude Oil Gathering Agreement (Oasis Midstream Partners LP)