Producers Facilities Electricity Sample Clauses

Producers Facilities Electricity. Section 7.1 Pressures at Receipt Points. Producer shall deliver or cause to be delivered Saltwater to each Receipt Point on the Gathering System from atmospheric tanks or from low pressure separation at sufficient pressure to enter Gatherer’s Receipt Point pump on the Gathering System against its operating pressure, except that Gatherer shall not be obligated to gather Saltwater at pressures in excess of the maximum allowable operating pressure of the Gathering System at such Receipt Point, as determined by Gatherer in its sole discretion. Gatherer shall operate its measurement and Receipt Point pump at a pressure that allows Producer to deliver Saltwater directly from its atmospheric tanks or low pressure separation into the Gathering System without additional pumps; provided that such atmospheric tanks have a minimum of four feet of hydrostatic head or low pressure separation at the low liquid level to allow Gatherer’s pumps to attain proper suction pressure.
AutoNDA by SimpleDocs
Producers Facilities Electricity 

Related to Producers Facilities Electricity

  • Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates. 14.02 Tenant agrees not to connect any additional electrical equipment of any type to the Building electric distribution system, beyond that on Tenant’s approved plans for initial occupancy, other than lamps, computers and other small office machines which consume comparable amounts of electricity, without Landlord’s prior written consent, not to be unreasonably withheld, conditioned or delayed, in each instance. In no event shall Tenant use or install any fixtures, equipment or machines the use of which in conjunction with other fixtures, equipment and machines in the Demised Premises would result in an overload of the electrical circuits servicing the Demised Premises or the Building.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to ICG.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • BUYER'S FACILITIES 1. Buyer will maintain at its own expense facilities from the delivery point to the point of use and the burners and equipment for using gas, and Buyer will at all times keep gas-using equipment on said premises in a condition conforming with such reasonable rules and regulations as may be prescribed therefore by regulatory authority having jurisdiction thereover and with the requirements of any valid law thereto appertaining. In the event that rules are not prescribed by a regulatory authority, Buyer will abide by codes as used in the gas industry. 2. Seller shall not approve sale of gas on an interruptible basis to Buyer until and unless Seller is satisfied that Buyer has, or will, install adequate stand-by facilities to meet its full fuel requirements during periods of sustained interruptions. 3. Seller shall not approve sales of gas to Buyer unless Seller is satisfied that Buyer has not, or will not interconnect downstream fuel piping of natural gas for use in different priority-of• service categories.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.