Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.
Operational Support Systems <<customer_name>> shall pay charges for Operational Support Systems (OSS) as set forth in this Agreement in Attachment 1 and/or in Attachments 2, 3 and 5, as applicable.
Remote Terminal Unit Prior to the Initial Synchronization Date of the Large Generating Facility, a Remote Terminal Unit, or equivalent data collection and transfer equipment acceptable to the Parties, shall be installed by Developer, or by Connecting Transmission Owner at Developer’s expense, to gather accumulated and instantaneous data to be telemetered to the location(s) designated by Connecting Transmission Owner and NYISO through use of a dedicated point-to-point data circuit(s) as indicated in Article 8. 1. The communication protocol for the data circuit(s) shall be specified by Connecting Transmission Owner and NYISO. Instantaneous bi-directional analog real power and reactive power flow information must be telemetered directly to the location(s) specified by Connecting Transmission Owner and NYISO. Each Party will promptly advise the appropriate other Party if it detects or otherwise learns of any metering, telemetry or communications equipment errors or malfunctions that require the attention and/or correction by that other Party. The Party owning such equipment shall correct such error or malfunction as soon as reasonably feasible.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.
Operations Support Systems (OSS) 47.1. Embarq will offer unbundled access to Embarq’s operations support systems to the extent technically feasible in a non-discriminatory manner at Parity. OSS consists of pre- ordering, ordering, provisioning, maintenance and repair, and billing functions supported by Embarq’s databases and information. The OSS element includes access to all loop qualification information contained in Embarq’s databases or other records, including information on whether a particular loop is capable of providing advanced services.
Operational Support Systems (OSS The terms, conditions and rates for OSS are as set forth in Section 2.13 of this Attachment.
Access Toll Connecting Trunk Group Architecture 9.2.1 If ECI chooses to subtend a Verizon access Tandem, ECI’s NPA/NXX must be assigned by ECI to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 ECI shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from ECI’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office ECI utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow ECI’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Unbundled Network Terminating Wire (UNTW) 2.8.3.1 UNTW is unshielded twisted copper wiring that is used to extend circuits from an intra-building network cable terminal or from a building entrance terminal to an individual End User’s point of demarcation. It is the final portion of the Loop that in multi-subscriber configurations represents the point at which the network branches out to serve individual subscribers. 2.8.3.2 This element will be provided in MDUs and/or Multi-Tenants Units (MTUs) where either Party owns wiring all the way to the End User’s premises. Neither Party will provide this element in locations where the property owner provides its own wiring to the End User’s premises, where a third party owns the wiring to the End User’s premises.
BUSINESS CONTINUITY/DISASTER RECOVERY In the event of equipment failure, work stoppage, governmental action, communication disruption or other impossibility of performance beyond State Street’s control, State Street shall take reasonable steps to minimize service interruptions. Specifically, State Street shall implement reasonable procedures to prevent the loss of data and to recover from service interruptions caused by equipment failure or other circumstances with resumption of all substantial elements of services in a timeframe sufficient to meet business requirements. State Street shall enter into and shall maintain in effect at all times during the term of this Agreement with appropriate parties one or more agreements making reasonable provision for (i) periodic back-up of the computer files and data with respect to the Trusts; and (ii) emergency use of electronic data processing equipment to provide services under this Agreement. State Street shall test the ability to recover to alternate data processing equipment in accordance with State Street program standards, and provide a high level summary of business continuity test results to the Trusts upon request. State Street will remedy any material deficiencies in accordance with State Street program standards. Upon reasonable advance notice, and at no cost to State Street, the Trusts retain the right to review State Street’s business continuity, crisis management, disaster recovery, and third-party vendor management processes and programs (including discussions with the relevant subject matter experts and an on-site review of the production facilities used) related to delivery of the service no more frequently than an annual basis. Upon reasonable request, the State Street also shall discuss with senior management of the Trusts any business continuity/disaster recovery plan of the State Street and/or provide a high-level presentation summarizing such plan.”