Project Control, Boundary Resolution, and Sanitary Sewer Ties Sample Clauses

Project Control, Boundary Resolution, and Sanitary Sewer Ties. Consultant will establish site control throughout the project, resolve boundary lines and tie/as built the existing sanitary sewer and trail from the Memorial Park Pump Station to Xxxxxxxx Road, as shown in the Topographic Survey Limits, included as Attachment B1 in the Request for Proposals. Work will include: ▪ Research Clackamas County survey records for recorded surveys, subdivision plats and road drawings that show the location of survey monuments been previously set within the planned work limits. ▪ Title reports will be ordered for the properties along the project route, which will disclose all existing easements. ▪ Field locate existing boundary and centerline monuments along the length of the project to resolve boundary lines. ▪ Establish horizontal control points at each end of the project site. ▪ A control traverse will be run along the entire length of the sewer route. ▪ Established horizontal control network will be tied into the existing control network set up for the Xxxxxxxx Road Corridor Project at the northern end of the project site. ▪ All sewer manholes will be tied, and the depths and size of pipe will be recorded. ▪ Ground shots will be recorded every 25 feet along the existing sanitary lines’ alignment between manholes. ▪ The existing “trail” in the vicinity of the sanitary sewer lines will be tied with a shot on each edge of the “trail” and a shot 20’ on each side. ▪ Wetland flags and features as flagged by wetlands biologists will be tied along the project route. (Assume 50 or less) ▪ Other Significant features as marked/tagged by consultant will be tied. (Assume 50 or less)
AutoNDA by SimpleDocs

Related to Project Control, Boundary Resolution, and Sanitary Sewer Ties

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • DNSSEC proper resolution There is a valid DNSSEC chain of trust from the root trust anchor to a particular domain name, e.g., a TLD, a domain name registered under a TLD, etc.

  • TCP DNS resolution RTT Refers to the RTT of the sequence of packets from the start of the TCP connection to its end, including the reception of the DNS response for only one DNS query. If the RTT is 5 times greater than the time specified in the relevant SLR, the RTT will be considered undefined.

  • Gold Open Access Articles May be shared according to the author-selected end-user license and should contain a CrossMark logo, the end user license, and a DOI link to the formal publication on ScienceDirect. Please refer to Elsevier's posting policy for further information.

  • UDP DNS resolution RTT Refers to the RTT of the sequence of two packets, the UDP DNS query and the corresponding UDP DNS response. If the RTT is 5 times greater than the time specified in the relevant SLR, the RTT will be considered undefined.

  • PUBLIC WORKS AND BUILDING SERVICES CONTRACTS Work being done under a resulting Authorized User Agreement may be subject to the prevailing wage rate provisions of the New York State Labor Law. Such work will be identified by the Authorized User within the RFQ. See “Prevailing Wage Rates – Public Works and Building Services Contracts’ in Appendix B, Clause 10, OGS General Specifications. Any federal or State determination of a violation of any public works law or regulation, or labor law or regulation, or any OSHA violation deemed "serious or willful" may be grounds for a determination of vendor non-responsibility and rejection of proposal. The Prevailing Wage Case Number for this Contract is PRC# 2014011745. The Prevailing Wage Rates for various occupations and General Provisions of Laws Covering Workers on Article 8 Public Work Contract can be accessed at the following NYS Department of Labor website: xxxxx://xxxxxxxxxxxx.xxxxx.xx.xxx/wpp/xxxxXxxxXxxxxxx.xx?method=showIt  Insert PRC# 2014011745 in the box provided and click Submit.  Click Wage Schedule located underneath the main header of this page. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. With the concurrence of the Contractor, the extension may be for a period of up to 6 months in lieu of 3 months. However, this extension terminates should the replacement Contract be issued in the interim. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G – Processes and Forms Templates for specific instructions on the usage of this Contract. OGS reserves the right to unilaterally make revisions, changes, additions and/or updates to the documents attached as Appendix G - Processes and Forms Templates without processing a formal amendment and/or modification. SPECIFICATIONS During the term of the Contract, the Authorized User may request Product specifications for particular items that have been included by the Contractor in its Pricing Pages. These specifications will be provided by the Contractor at no cost.

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • Member Access to Vendor Proposal Notwithstanding any other information provided in this solicitation or Vendor designation of certain documentation as confidential or proprietary, Vendor’s acceptance of this TIPS Contract constitutes Vendor’s consent to the disclosure of Vendor’s comprehensive proposal, including any information deemed confidential or proprietary, to TIPS Members. The proposing Vendor agrees that TIPS shall not be responsible or liable for any use or distribution of information or documentation by TIPS Members or any other party. By submitting this proposal, Vendor certifies the foregoing.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Course Curriculum, Instruction, and Grading X. Xxxx College courses offered as dual credit, regardless of where they are taught, follow the same syllabus, course outline, textbook, grading method, and other academic policies as the courses outlined in the Hill College catalog.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!