Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things: A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement; B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued; C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 54 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 12 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to t o the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 5 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit Attachment A, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 5 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit Attachment A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 4 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, Attachment A and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 4 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B A and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 3 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit ATTACHMENT A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit ATTACHMENT B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 3 contracts
Samples: Grant Agreement, Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit Attachment A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B A and that unpaid costs have been properly accrued;
C. that the Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B A and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other thingsthings :
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A1, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B 1 and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A___, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B ____ and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation doc umentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A1, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in [Exhibit B #] and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit AAttachment A and E, the Grant Applicationgrant application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit Attachment A, the Grant Application, and the terms and conditions of the Grant Agreement;.
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit Attachment B and that unpaid costs have been properly accrued;.
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A1, the Grant ApplicationExhibit 2, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B 1 and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee Subrecipient shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Subrecipient's Grant Application, Application and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth budget presented in Exhibit B the Subrecipient's Grant Application and that unpaid costs have been properly accrued;
C. that Grantee the Subrecipient is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State. The Subrecipient will take all necessary actions to correct or cure any problematic findings identified by the State during its monitoring and evaluation.
Appears in 1 contract
Samples: Subrecipient Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit Attachment A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B Contract # 48995 and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee Subrecipient shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Subrecipient's Grant Application, Application and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth budget presented in Exhibit B Subrecipient's Grant Application and that unpaid costs have been properly accrued;
C. that Grantee Subrecipient is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State. The Subrecipient will take all necessary actions to correct or cure any problematic findings identified by the State during its monitoring and evaluation.
Appears in 1 contract
Samples: Subrecipient Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:: Process
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B A and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee Subrecipient shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Subrecipient’s Grant Application, Application and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth budget presented in Exhibit B Subrecipient’s Grant Application and that unpaid costs have been properly accrued;
C. that Grantee Subrecipient is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State. The Subrecipient will take all necessary actions to correct or cure any problematic findings identified by the State during its monitoring and evaluation.
Appears in 1 contract
Samples: Subrecipient Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit AExhibits 1 and 2, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B Exhibits 1 and 2 and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit ATTACHMENT A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of states xxxx, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit ATTACHMENT B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after aft er it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A_ _, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B __ and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement
Project Monitoring by the State. The State may conduct on-site or off-site monitoring reviews of the Project during the term of this Grant Agreement and for up to ninety (90) days after it expires or is otherwise terminated. The Grantee shall extend its full cooperation and give full access to the Project site and to relevant documentation to the State or its authorized designees for the purpose of determining, among other things:
A. whether Project activities are consistent with those set forth in Exhibit A, the Grant Application, and the terms and conditions of the Grant Agreement;
B. the actual expenditure of state, local and/or private funds expended to date on the Project is in conformity with the amounts for each Budget line item as set forth in Exhibit B and that unpaid costs have been properly accrued;
C. that Grantee is making timely progress with the Project, and that its project management, financial management and control systems, procurement systems and methods, and overall performance are in conformance with the requirements set forth in this Grant Agreement and are fully and accurately reflected in Project reports submitted to the State.
Appears in 1 contract
Samples: Grant Agreement