Common use of PROSECUTION AND PROGRESS Clause in Contracts

PROSECUTION AND PROGRESS. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work). Upon Notice of Award, the Contractor will be required to submit a Progress Schedule. Normal workday for this project shall be 8:00AM to 7:00PM and the normal workweek shall be Monday through Friday. The City will consider extended workdays or workweeks upon written request by the Contractor on a case by case basis. No work will be allowed on national holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.). No lane closures will be allowed on major streets except between the hours of 9:00AM to 4:00PM as noted in the Special Conditions section of this ITB. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage held by the City. The contractor will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar days. The contractor shall provide all material, labor, and equipment necessary to perform the work without delay unto completion. The standard order of operations for resurfacing shall be as follows:

Appears in 3 contracts

Samples: Professional Services Agreement Services, Professional Services Agreement Services, Professional Services Agreement Services

AutoNDA by SimpleDocs

PROSECUTION AND PROGRESS. The Contractor will have two hundred seventy (270) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $300.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will have 180 calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 3:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will have One Hundred Twenty (120) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $150.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will have Two Hundred and Seventy (270) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $300.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will have Sixty (60) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $110.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Contractors who only submit a final invoice upon completion and acceptance of all work shall not have liquidated damages withheld and be paid in less than 30 days from receipt of the invoice. Contractor will have the opportunity to submit an invoice after the first 30 days have passed for completed work accepted by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City Work requiring loud constant noise will consider extended workdays be required to be conducted after normal workday hours or workweeks upon written request by the Contractor on a case by case basisweekends. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No lane closures AFTER HOURS WORK: 8am- 5pm are normal hours. Anything before or after hours needs to be scheduled and approved through the City’s Project Manager. All work before normal hours must be completed by 7:45am. Any type of work the puts out a strong odor, loud noises, or material delivery that disrupts normal business will need to be allowed on major streets except between scheduled after normal work hours such as: • Soldering or braising copper pipe • Painting or staining • Any type of hammering, shooting, or drilling that disrupts normal business • Draining the hours of 9:00AM to 4:00PM as noted in the Special Conditions section of this ITB. building fire sprinkler system • Delivering materials that blocks normal business The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the Contractor that all work is complete. A Punch List of found deficiencies will be submitted to the Contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due to the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

AutoNDA by SimpleDocs

PROSECUTION AND PROGRESS. The Contractor will have Sixty (60) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $150.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31September 30, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)2021. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $300.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City will consider extended workdays or workweeks work weeks upon written request by the Contractor on a case by case basisrequest. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No The Contractor shall not install lane closures will be allowed or perform work or move equipment or materials on major streets except the traveled way that interferes with traffic flow between the hours of 9:00AM 6:00 am to 4:00PM as noted in the Special Conditions section of this ITB9:00 am and 4:00 pm to 7:00 pm (Monday through Friday), and 9:00 am to 1:00 pm on Sundays. The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement

PROSECUTION AND PROGRESS. The Contractor will have Sixty (60) calendar days from issuance of Notice to Proceed to be substantially complete with the project. The Contractor will be considered substantially complete when all contract work except for punch list work has been completed and accepted. The Contractor will mobilize with sufficient forces such that all construction identified as part of this contract shall be substantially completed by March 31, 2023. The contractor will be considered substantially complete when all work required by this contract has been completed (excluding final striping and punch list work)the completion date indicated above. Upon Notice of Award, Award the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated damages in the amount of $110.00 per calendar day for any work not completed by the deadline. Liquidated damages shall be deducted from the 10% retainage held by the City. Contractors who only submit a final invoice upon completion and acceptance of all work shall not have liquidated damages withheld and be paid in less than 30 days from receipt of the invoice. Contractor will have the opportunity to submit an invoice after the first 30 days have passed for completed work accepted by the City. Normal workday for this project shall be 8:00AM 8:00 AM to 7:00PM 5:00 PM and the normal workweek work week shall be Monday through Friday. The City Work requiring loud constant noise will consider extended workdays be required to be conducted after normal workday hours or workweeks upon written request by the Contractor on a case by case basisweekends. No work will be allowed on national City holidays (i.e. July 4th, Labor Day, Veterans Day, Thanksgiving, etc.a complete list can be found on the City website). No lane closures AFTER HOURS WORK: 8am- 5pm are normal hours. Anything before or after hours needs to be scheduled and approved through the City’s Project Manager. All work before normal hours must be completed by 7:45am. Any type of work the puts out a strong odor, loud noises, or material delivery that disrupts normal business will need to be allowed on major streets except between scheduled after normal work hours such as:  Soldering or braising copper pipe  Painting or staining  Any type of hammering, shooting, or drilling that disrupts normal business  Draining the hours of 9:00AM to 4:00PM as noted in the Special Conditions section of this ITB. building fire sprinkler system  Delivering materials that blocks normal business The work will require bidder to provide all labor, administrative forces, equipment, materials and other incidental items to complete all required work. The City shall perform a Final Inspection upon substantial notification from the Contractor that all work is complete. A Punch List of found deficiencies will be submitted to the Contractor upon completion of the work. The contractor will be allowed to participate in the Final Inspection. All repairs shall be completed by the contractor Contractor at his expense prior to issuance of Final Acceptance. The contractor shall be assessed liquidated damages in the amount of $200.00 per calendar day for any contract work (excluding punch list and permanent striping) that is not completed by November 30, 2023. Liquidated damages shall be deducted from the 10% retainage will be held from the total amount due the Contractor until Final Acceptance of work is issued by the City. The contractor City will also be assessed liquidated damages for not completing any required Punch List work within 45 calendar daysretain 10% of the fee due to the Contractor. The contractor shall provide all material, labor, retainage will be paid as the final invoice after the project has been completed and equipment necessary to perform the accepted. All punch-list work without delay unto completion. The standard order must be complete before release of operations for resurfacing shall be as follows:any retainage.

Appears in 1 contract

Samples: Contract Agreement