Protection SUF at Bath Substation. a. Developer will perform the following work at the Bath Substation: Engineer and procure the relay switchboard panels. Engineer and procure all control cables. Engineer, all in-ground. This includes all foundations, as well as conduits, trench, and grounding. b. Connecting Transmission Owner to perform the following work at the Bath Substation: Replace the existing 953 line relaying and install two groups of line relays with addition of a new panel. Procure and construct, all in-ground. This includes all foundations, as well as conduits, trench, and grounding. Install and terminate control cables at the substation equipment and at the control house termination cabinet. Install relay switchboard panels at Bath Substation. C. Cost Estimates Total $6,312,771.72 III. SYSTEM DELIVERABILITY UPGRADES