Purchase of an Existing Facility. In the event sale of an existing facility is proposed by a Bidder, and if the facility is interconnected to PACE and commercially operable as of the bid response date, the Company will consider purchasing, owning and operating the facility. Any such purchase would be contingent on disclosure to the Company by the Bidder of all information regarding the facility that may be material to the Company’s decision to make the purchase, including without limitation all potential or existing claims or liabilities, on the Company’s completion of and satisfaction with the results of such due diligence inquiries that the Company may deem appropriate in its sole discretion, and on the transfer of good and marketable title to the Company by the Bidder, free and clear of any and all liens and encumbrances. Such inquiries may include, but will not be limited to, site inspections, interviews, audit of all applicable books, contracts, forecasts, and records, and/or an assessment of past, future, or potential environmental liabilities. In addition, any existing network or point-to-point transmission rights associated with the facility’s output must be released and reassigned to the Company, at the Company’s option. Such due diligence will be performed by qualified generation experts, who may be third-party legal and environmental experts and consultants satisfactory to the Company in its sole discretion, in addition to Company personnel. The Company reserves the right to no longer consider the resource, if in its sole discretion; it determines that there are aspects of the resource not in the best interest of the Company and its customers. The Company will require the following information outlined in Appendix C-4 to be provided by the Bidder in order to determine if the asset will be evaluated and the priorities of the evaluation. Existing power supply obligations associated with the facility, if any, shall not be assigned to the Company unless the Company, in its sole discretion, accepts such assignment. The Company’s aggregate “all-in” capital cost for the EPC resource shall include all payments to be made to the Bidder.
AutoNDA by SimpleDocs

Related to Purchase of an Existing Facility

  • OGS Centralized Contract: Terms and Conditions The terms and conditions set forth in this section are expressly incorporated in and applicable to the Contract. Captions are intended as descriptive and are not intended to limit or otherwise restrict the terms and conditions set forth herein. Appendix A Appendix A, Standard Clauses for New York State Contracts, dated January 2014, attached hereto, is hereby incorporated in, and expressly made a part of, this Contract. Appendix B Appendix B, Office of General Services General Specifications, dated January 2015 22772 Project Based Information Technology Consulting (Statewide), attached hereto, is hereby incorporated in, and expressly made a part of, this Contract.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • WILEY OPEN ACCESS TERMS AND CONDITIONS Wiley Publishes Open Access Articles in fully Open Access Journals and in Subscription journals offering Online Open. Although most of the fully Open Access journals publish open access articles under the terms of the Creative Commons Attribution (CC BY) License only, the subscription journals and a few of the Open Access Journals offer a choice of Creative Commons Licenses. The license type is clearly identified on the article.

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • Price Adjustments for OGS Centralized Contracts Periodic price adjustments will occur no more than twice per year on a schedule to be established solely by OGS. Pricing offered shall be fixed for the first twelve (12) months of the Contract term. Such price increases will only apply to the OGS Centralized Contracts and shall not be applied retroactively to Authorized User Agreements or any Mini-bids already submitted to an Authorized User. Price Decreases Price decreases may be made at any time. Additionally, some price decreases shall be calculated in accordance with Appendix B, section 17, Pricing.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.