Quality Control by Vifor Sample Clauses

Quality Control by Vifor 
AutoNDA by SimpleDocs

Related to Quality Control by Vifor

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Commodity Compliance and Compatibility It is the Contractor’s responsibility to ensure that the Commodities supplied are compliant with the Contract requirements, specifications, terms, and conditions. Additionally, the Contractor shall ensure that all Commodities ordered by the Customer are fully compatible with each other and with any associated pre-existing Commodity possessed by the Customer and disclosed to the Contractor by the Customer. The Contractor’s acceptance of the Customer’s order shall indicate that the Contractor agrees to deliver a Commodity that is fully compliant and compatible with the Customer’s order requirements, specifications, terms, and conditions. In the event any ordered Base Equipment, OEM and Non-OEM Option(s), Part(s), Accessory(ies), and Implement(s); and their respective features, equipment, and components are found by the Customer to be missing, incorrect, defective, damaged, non- compatible, or non-compliant, the Contractor shall, at the Customer’s discretion, be required to complete one of the following: • Install or repair the Base Equipment, OEM and Non-OEM Option(s), Part(s), Accessory(ies), and Implement(s), and their respective features, equipment, and components; • Replace the Base Equipment, OEM and Non-OEM Option(s), Part(s), Accessory(ies), and Implement(s); and their respective features, equipment, and components; • Refund the purchase price of the Base Equipment, OEM and Non-OEM Option(s), Part(s), Accessory(ies), and Implement(s); and their respective features, equipment, and components to the Customer. Any changes necessary after the delivery of the Customer’s order that are required to bring a Commodity into compliance or compatibility due to an incorrect order fulfillment by the Contractor shall be accomplished at the Contractor’s expense.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Events Beyond Our Control If an Event Beyond Our Control occurs and prevents Us from performing any of Our obligations under this Contract to any extent, then We are not required to perform that obligation to the extent and for as long as We are prevented by that Event Beyond Our Control. If such an Event Beyond Our Control occurs and We consider it appropriate to do so, We may notify You of the Event Beyond Our Control by any reasonable means, including by a public announcement.

Time is Money Join Law Insider Premium to draft better contracts faster.