Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.
HHS Single Audit Unit will notify Grantee to complete the Single Audit Determination Form If Grantee fails to complete the form within thirty (30) calendar days after receipt of notice, Grantee maybe subject to sanctions and remedies for non-compliance.
Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.
Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.
Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.
System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.
Evaluation Cycle Goal Setting and Development of the Educator Plan A) Every Educator has an Educator Plan that includes, but is not limited to, one goal related to the improvement of practice; one goal for the improvement of student learning. The Plan also outlines actions the Educator must take to attain the goals established in the Plan and benchmarks to assess progress. Goals may be developed by individual Educators, by the Evaluator, or by teams, departments, or groups of Educators who have the similar roles and/or responsibilities. See Sections 15-19 for more on Educator Plans. B) To determine the goals to be included in the Educator Plan, the Evaluator reviews the goals the Educator has proposed in the Self-Assessment, using evidence of Educator performance and impact on student learning, growth and achievement based on the Educator’s self-assessment and other sources that Evaluator shares with the Educator. The process for determining the Educator’s impact on student learning, growth and achievement will be determined after ESE issues guidance on this matter. See #22, below. C) Educator Plan Development Meetings shall be conducted as follows: i) Educators in the same school may meet with the Evaluator in teams and/or individually at the end of the previous evaluation cycle or by October 15th of the next academic year to develop their Educator Plan. Educators shall not be expected to meet during the summer hiatus. ii) For those Educators new to the school, the meeting with the Evaluator to establish the Educator Plan must occur by October 15th or within six weeks of the start of their assignment in that school iii) The Evaluator shall meet individually with Educators with PTS and ratings of needs improvement or unsatisfactory to develop professional practice goal(s) that must address specific standards and indicators identified for improvement. In addition, the goals may address shared grade level or subject matter goals. D) The Evaluator completes the Educator Plan by November 1st. The Educator shall sign the Educator Plan within 5 school days of its receipt and may include a written response. The Educator’s signature indicates that the Educator received the plan in a timely fashion. The signature does not indicate agreement or disagreement with its contents. The Evaluator retains final authority over the content of the Educator’s Plan.
Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.