Repair of Damaged or Adversely Affected Public Drainage Systems Sample Clauses

Repair of Damaged or Adversely Affected Public Drainage Systems 
AutoNDA by SimpleDocs

Related to Repair of Damaged or Adversely Affected Public Drainage Systems

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Repair of Damage If the Premises shall be damaged by fire or other casualty, then Landlord shall proceed to repair and restore (subject to receipt of insurance proceeds) the Premises to its condition preceding the damage, subject to the provisions of this Article 10. Landlord shall have no liability to Tenant, and Tenant shall not be entitled to terminate this Lease, if such repairs and restoration are not in fact completed within Landlord's estimated time period, so long as Landlord shall have proceeded with reasonable due diligence. The Rent until such repairs shall be made shall be reduced in the proportion which the area of the part of the Premises which is not usable by Tenant bears to the total area of the Premises; provided, however, should Tenant reoccupy a portion of the Premises for the conduct of its business prior to the date such repairs are made, the Rent shall be reinstated with respect to such reoccupied portion of the Premises and shall be payable by Tenant from the date of such occupancy. Further, should Landlord, at its sole option, make available to Tenant, during the period of such repair, other space in the Building which is reasonably suitable for the temporary carrying on of Tenant's business, the Rent shall be reinstated with respect to such temporarily occupied space and shall be payable by Tenant from the date such space is occupied by Tenant. Whenever in this Article 10 reference is made to restoration of the Premises, (i) Tenant's obligation shall be as to all property within the Premises including Tenant's furniture, fixtures, equipment and other personal property, any and all Alterations, construction or other improvements made to the Premises by or on behalf of Tenant and any other leasehold improvements existing in the Premises on the date hereof, all of which shall be restored and replaced at Tenant's sole cost and expense and (ii) Landlord's obligation, if any, shall be as to the shell, which constitutes the structure of the Building and the mechanical, electrical, plumbing, air-conditioning and other building systems up to the point of connection into the Premises. Landlord's obligation to repair or rebuild, and Tenant's right to rent abatement, as described in this Article 10, are only effective provided the damage or destruction is not due to the intentional or negligent acts or omissions of Tenant, its agents, employees, licensees or invitees. During any period of Tenant's repair and restoration following substantial completion of a Landlord's repair and restoration work, Rent and additional rent shall be payable as if said fire or other casualty had not occurred.

  • Goods, Standards and Appurtenances Any Goods delivered must be standard new Goods, latest model, except as otherwise specifically stated in the Contract. Remanufactured, refurbished or reconditioned equipment may be accepted but only to the extent allowed under the Contract. Where the Contract does not specifically list or describe any parts or nominal appurtenances of equipment for the Goods, it shall be understood that the Contractor shall deliver such equipment and appurtenances as are usually provided with the manufacturer's stock model.

  • Condition of the Contractor’s Property or Equipment The Contractor shall make the Property and/or equipment available to the Judicial Council, pursuant to the terms and conditions set forth in this Agreement. The Contractor shall immediately remedy any problem with the Property’s physical plant or equipment that impairs or diminishes the quality of the Program. The Contractor shall ensure the appropriate hot water, heating, and ventilation is provided at the Property during the Program, inclusive in the prices set forth herein.

  • Offtake constraints due to Backdown The Solar Power Developer and Buying Entity shall follow the forecasting and scheduling process as per the regulations in this regard by the Appropriate Commission. The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must-run” to solar power projects. Accordingly, no solar power plant, duly commissioned, should be directed to back down by a Discom/ Load Dispatch Centre (LDC). In the eventuality of backdown, including backdown on account of non-dispatch of power due to non-compliance with “Order No. 23/22/2019- R&R dated 28.06.2019 of Ministry of Power regarding Opening and maintaining of adequate Letter of Credit (LC) as Payment Security Mechanism under Power Purchase Agreements by Distribution Licensees” and any clarifications or amendment thereto, except for the cases where the Backdown is on account of events like consideration of grid security or safety of any equipment or personnel or other such conditions, subject to the submission of documentary evidences from the competent authority, the SPD shall be eligible for a minimum generation compensation, from Buying Entity, restricted to the following and there shall be no other claim, directly or indirectly against SECI: Duration of Backdown Provision for Generation Compensation Hours of Backdown during a monthly billing cycle. Generation Compensation = 100% of [(Average Generation per hour during the month) X (number of backdown hours during the month)] X PPA tariff Where, Average Generation per hour during the month (kWh) = Total generation in the month (kWh) ÷ Total hours of generation in the month

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • General Assembly Appropriation The Recipient hereby acknowledges and agrees that the financial assistance provided under this Agreement is entirely subject to, and contingent upon, the availability of funds appropriated by the General Assembly for the purposes set forth in this Agreement and in Chapter 164 of the Revised Code. The Recipient further acknowledges and agrees that none of the duties and obligations imposed by this Agreement on the Director shall be binding until the Recipient has complied with all applicable provisions of Chapter 164 of the Revised Code and Chapter 164-1 of the Administrative Code and until the Recipient has acquired and committed all funds necessary for the full payment of the Matching Funds applicable to the Project.

  • Damage to Equipment The Parties shall exercise all necessary precautions to avoid causing damage to the other Party’s poles and Equipment and other pole attachers’ Equipment and shall assume responsibility to each other for any and all loss from any damage to the other Party’s poles or Equipment and reimburse the other Party for the entire expense incurred in making such repairs. Each Party shall assume responsibility to third parties for any and all loss from any damage caused to third party’s Equipment by such Party and shall reimburse such third party for the entire expense incurred in making repairs.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

Time is Money Join Law Insider Premium to draft better contracts faster.