Road Over /Under Bridges Sample Clauses

Road Over /Under Bridges. A. The details of Road Over Bridges in the Site are given in Table A-6. Table A-6 List of ROBs S. No. Existing Chainage Span Arrangement Total Length Overall Width Clear Height Available Type of Super Structure Type of Sub Structure Type of Foundation Nil B. The details of Road Under Bridges in the Site are given in Table A-7. Table A-7 List of RUBs Sl. No. Existing Chainage Span Arrangement Vertical clearance Clear Width Type of Super Structure Type of Sub Structure Type of Foundation Nil
AutoNDA by SimpleDocs

Related to Road Over /Under Bridges

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • Train Operator Events of Default The following are Train Operator Events of Default:

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

  • Additional Acceptable Uses of Student Data Contractor is prohibited from using Student Data for any secondary use not described in this agreement except:

  • CHANGES TO THE ORIGINAL LEARNING AGREEMENT The section to be completed during the mobility is needed only if changes have to be introduced into the original Learning Agreement. In that case, the section to be completed before the mobility should be kept unchanged and changes should be described in this section. When changes to the mobility programme arise, they should be agreed as soon as possible with the sending institution. In case the change concerns an extension of the duration of the mobility programme abroad, the request can be made by the trainee at the latest one month before the foreseen end date. All parties must confirm that the proposed amendments to the Learning Agreement are approved. For this specific section, original or scanned signatures are not mandatory and an approval by email may be enough. The procedure has to be decided by the sending institution, depending on the national legislation.

  • MISCELLANEOUS WORKING CONDITIONS Clothing

  • Exceptional Access to Thick Registration Data In case of a registrar failure, deaccreditation, court order, etc. that prompts the temporary or definitive transfer of its domain names to another registrar, at the request of ICANN, Registry Operator will provide ICANN with up-­‐to-­‐date data for the domain names of the losing registrar. The data will be provided in the format specified in Specification 2 for Data Escrow. The file will only contain data related to the domain names of the losing registrar. Registry Operator will provide the data as soon as commercially practicable, but in no event later than five (5) calendar days following ICANN’s request. Unless otherwise agreed by Registry Operator and ICANN, the file will be made available for download by ICANN in the same manner as the data specified in Section 3.1 of this Specification.

Time is Money Join Law Insider Premium to draft better contracts faster.