ROCK EXCAVATION, UTILITIES Sample Clauses

ROCK EXCAVATION, UTILITIES. A. Rock excavation for utilities shall include all hard, solid rock ledges, bedded deposits and unstratified masses and all conglomerate deposits, or any other material so firmly cemented, that in the opinion of ENGINEER, it is not practical to excavate and remove same with a 225-net flywheel horsepower trench backhoe or equal, except after continuous drilling and blasting. Soft or disintegrated rock which can be removed with a pick, loose, shaken or previously broken rock, or rock which may fall into the excavation from outside the limits of excavation will not be classified as rock excavation. Rock excavation shall also include all rock boulders necessary to be removed having a volume of 2 cubic yards or more. B. When rock is encountered, it shall be stripped of earth and ENGINEER or OWNER's representative notified and given proper time to evaluate same before removal. Any rock removed which has not been measured by ENGINEER or OWNER's representative will not be classified as rock excavation. C. The depth of trench in rock shall be 6 inches below the lowest outside bottom of the pipe. D. All rock excavated from the trench shall be classified as undesirable backfill material and shall be disposed of as specified in the excavation to grade section. All trenches in rock shall be backfilled with bedding, cover, and backfill material furnished by CONTRACTOR.
AutoNDA by SimpleDocs

Related to ROCK EXCAVATION, UTILITIES

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • New utilities (i) The Contractor shall allow, subject to the permission from the Authority and such conditions as the Authority may specify, access to, and use of the Site for laying telephone lines, water pipes, electricity lines/ cables or other public utilities. Where such access or use causes any financial loss to the Contractor, it may require the user of the Site to pay compensation or damages as per Applicable Laws. For the avoidance of doubt, it is agreed that use of the Site under this Clause 9.3 shall not in any manner relieve the Contractor of its obligation to construct and maintain the Project Highway in accordance with this Agreement and any damage caused by such use shall be restored forthwith at the cost of the Authority. (ii) The Authority may, by notice, require the Contractor to connect any adjoining road to the Project Highway, and the connecting portion thereof falling within the Site shall be constructed by the Contractor at the Authority’s cost in accordance with Article 10. (iii) The Authority may by notice require the Contractor to connect, through a paved road, any adjoining service station, hotel, motel or any other public facility or amenity to the Project Highway, whereupon the connecting portion thereof that falls within the Site shall be constructed by the Contractor on payment of the cost. The cost to be paid by the Authority to the Contractor shall be determined by the Authority’s Engineer. For the avoidance of doubt, in the event such road is to be constructed for the benefit of any entity, the Authority may require such entity to make an advance deposit with the Contractor or the Authority, as the case may be, of an amount equal to the estimated cost as determined by the Authority’s Engineer and such advance shall be adjusted against the cost of construction as determined by the Authority’s Engineer hereunder. (iv) In the event construction of any Works is affected by a new utility or works undertaken in accordance with this Clause 9.3, the Contractor shall be entitled to a reasonable Time Extension as determined by the Authority’s Engineer.

  • COMMON UTILITIES Expenses for serving/supply of common facilities and utilities and all charges incidental thereto.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Public Utilities No Restricted Entity or Affiliate thereof is a "holding company," or a "subsidiary company" of a "holding company," or an "affiliate" of a "holding company" or of a "subsidiary company" of a "holding company," within the meaning of the Public Utility Holding Company Act of 1935, as amended. No Restricted Entity or Affiliate thereof is a regulated public utility.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Buildings and Structures 1. Repair or retrofit of buildings less than 45 years old. 2. Removal of water by physical or mechanical means. 3. Installation of exterior security features and early warning devices on existing light poles or other permanent utilities.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot].

  • Project or Building Name and Signage Landlord shall have the right at any time to change the name of the Project or Building and to install, affix and maintain any and all signs on the exterior and on the interior of the Project or Building as Landlord may, in Landlord’s sole discretion, desire. Tenant shall not use the name of the Project or Building or use pictures or illustrations of the Project or Building in advertising or other publicity or for any purpose other than as the address of the business to be conducted by Tenant in the Premises, without the prior written consent of Landlord.