Sample Panel Materials and Tubing Sample Clauses

Sample Panel Materials and Tubing. Sample panels are constructed of material to ensure there is no corrosion taking place on the surfaces. Both dry and wet surfaces are protected from corrosion by using either 304SS or epoxy coated steel. Sample tubing around the panel is either a SA249-TP 316 SS or ASTM S312 316 SS. The tubing bends are minimised and long radius bends are used. Bending of tubing is done as opposed to use of fittings as to connect tubing.
AutoNDA by SimpleDocs

Related to Sample Panel Materials and Tubing

  • MATERIALS AND WORKMANSHIP Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

  • Quality of Materials and Workmanship Unless otherwise specified, all materials shall be new, and both workmanship and materials shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials and work. The burden of proof is on the Contractor.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • Materials and Improvements Title to materials, improvements, and other property required of PURCHASER by this contract shall vest in and become the property of STATE at the time such are furnished by PURCHASER and accepted by STATE. Only materials, improvements, and property free and clear of liens, claims, and encumbrances shall be furnished by PURCHASER. All existing improvements located on State land, and any improvements placed on State land by PURCHASER which become the property of STATE, shall be safeguarded by PURCHASER. If such improvements are injured, damaged, or removed from the areas of operations by PURCHASER or by contractors of PURCHASER, such improvements shall be repaired (or replaced, in the event of removal,) as soon as possible by PURCHASER, without cost to STATE.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and that establish the standards by which such portion of the Work will be judged. The Contractor shall furnish for approval all samples required by the Contract Documents. The Work shall be in accordance with approved samples.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!