Sample preparation and measurement conditions Sample Clauses

Sample preparation and measurement conditions. The procedure for measuring the surface area by nitrogen adsorption isotherms is according to ISO (2006, 2007 and 2010) and IUPAC (1985). The most critical step in the measurement is the outgassing stage, i.e. to clear the clear the adsorbent surface to any adsorbed molecules before the measurements. The outgassing process of the solid sample can be performed at room temperature, or at a higher temperature to promote desorption of strongly adsorbed species. The pre-treatment conditions must remain sufficiently mild to avoid any modification of the textural characteristics of the sample but severe enough to obtain a good surface clean-up. It is recommended to perform the pre-treatment in the cell used to carry out the adsorption. Whatever the temperature, the solid must be submitted to a minimum vacuum of 10-2 Nm-2 i.e. 10 mPa during at least one hour. Such conditions are readily achieved with the aid of conventional vacuum equipment, usually a combination of a rotary and diffusion pump. In general, the lower the temperature, the longer the outgassing process should be. For more detailed description of the isotherms, its always recommend using as many experimental points as possible.
AutoNDA by SimpleDocs

Related to Sample preparation and measurement conditions

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

  • Completion of Evaluation Cycle 1. The summative evaluation rating shall be based upon a preponderance of the evidence, assessed in a holistic manner, that is aligned to the Ohio Educator Standards. Only evidence gathered during the walkthroughs and formal observations that are conducted for the current school year may be used.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference. Adherence to these accessible technology standards is one way to ensure compliance with the College’s underlying legal obligations to ensure that people with disabilities are able to acquire the same information, engage in the same interactions, and enjoy the same benefits and services within the same timeframe as their nondisabled peers, with substantially equivalent ease of use; that they are not excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in any College programs, services, and activities delivered online, as required by Section 504 and the ADA and their implementing regulations; and that they receive effective communication of the College’s programs, services, and activities delivered online.

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Performance Measures and Metrics This section outlines the performance measures and metrics upon which service under this SLA will be assessed. Shared Service Centers and Customers will negotiate the performance metric, frequency, customer and provider service responsibilities associated with each performance measure. Measurements of the Port of Seattle activities are critical to improving services and are the basis for cost recovery for services provided. The Port of Seattle and The Northwest Seaport Alliance have identified activities critical to meeting The NWSA’s business requirements and have agreed upon how these activities will be assessed.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Electronic and Information Resources Accessibility and Security Standards a. Applicability: The following Electronic and Information Resources (“EIR”) requirements apply to the Contract because the Grantee performs services that include EIR that the System Agency's employees are required or permitted to access or members of the public are required or permitted to access. This Section does not apply to incidental uses of EIR in the performance of the Agreement, unless the Parties agree that the EIR will become property of the State of Texas or will be used by HHSC’s clients or recipients after completion of the Agreement. Nothing in this section is intended to prescribe the use of particular designs or technologies or to prevent the use of alternative technologies, provided they result in substantially equivalent or greater access to and use of a Product.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Tests, Labs, and Imaging and X rays (diagnostic) This plan covers diagnostic tests, labs, and imaging and x-rays to diagnose or treat a condition when ordered by a physician. Major Diagnostic Imaging and Tests Major diagnostic imaging and tests include but are not limited to: • magnetic resonance imaging (MRI), • magnetic resonance angiography (MRA), • computerized axial tomography (CAT or CT scans), • nuclear scans, • positron emission tomography (PET scan), and • cardiac imaging. Preauthorization may be required for major diagnostic imaging and tests. This plan covers MRI examinations when the quality assurance standards of R.I. General Law §27-20-41 are met. MRI examinations conducted outside of the State of Rhode Island must be performed in accordance with the applicable laws of the state in which the examination has been conducted. Diagnostic Imaging and X-rays (other than the imaging services noted above) Diagnostic imaging and x-rays include but are not limited to: • general imaging (such as x-rays and ultrasounds), and • mammograms.

Time is Money Join Law Insider Premium to draft better contracts faster.